1 / 40

Timber framing code 2008: Floor Framing.

Timber framing code 2008: Floor Framing. Specification:. Timber framed construction Conventional timber framed roof Roof pitch 22.50 Roof covering steel roof decking, 10kg/m2 Eaves width 600mm Brick piers supporting bearers Bearers 150 x 75 Unseasoned Hardwood, F11

carlow
Download Presentation

Timber framing code 2008: Floor Framing.

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Timber framing code 2008: Floor Framing.

  2. Specification: • Timber framed construction • Conventional timber framed roof • Roof pitch 22.50 • Roof covering steel roof decking, 10kg/m2 • Eaves width 600mm • Brick piers supporting bearers • Bearers 150 x 75 Unseasoned Hardwood, F11 • Joists 100 x 50 Unseasoned Hardwood, F11 • Fitted timber floors Utility grade 19mm T&G Radiata Pine • Wet area flooring 19mm CSR structafloor particleboard

  3. Remember the following information: • Type of flooring determines the MAX SPACING of floor joists • SPAN of joists determines the SPACING of bearers • SPAN of bearers determines SPACING of piers

  4. Flooring

  5. Flooring

  6. Flooring

  7. Flooring

  8. Floor Joists

  9. Floor Joists

  10. Floor Joists

  11. Floor Joists

  12. Floor Joists

  13. Bearers, Clause 4.3.1 • The max span of 1600 for the floor joists will determine the max spacing of the bearers parallel to the building length. • Determine from the various tables the span for the given bearer size (150x75). • These spans determine the pier spacings

  14. Bearers supporting load–bearing walls • RLW = Rafter span + overhang • Rafter run • = 7.470 / 2 • Rafter run= 3.735 • Rafter length = 3.735 / Cos 22.5o • Rafter length = 4.042 • Overhang =600 / Cos 22.5o • Overhang =0.649 • RLW = 4.042+0.649 = 2.670 2 • RLW = 2.7

  15. FLW Bearers: load bearing walls • Table one of Supplement 13 • Say RLW of 4500 (2700 actual) • FLW = 1600/2 = 800 (based on max joist span) • Read max bearer span from table 1 for FLW 1200 • Allowable span for 150 x 75 = 1700

  16. Bearers: floor loads only • Table 5, supplement 13 • FLW = ? (Based on max joist span) • FLW = 1600 • Go to Table 5 for FLW 1800 • Allowable span of bearer: 150x75 = 2100

  17. Centreline spacing of brick piers • Supporting load bearing walls This is determined by the span of the bearer supporting load bearing walls • = span of bearer plus 230 (size of brick pier) • = 1700 + 230 • = 1930

  18. Centreline spacing of brick piers • Supporting floor loads only This is determined by the span of the bearer supporting floor loads only. • Span of bearer plus 230 (size of brick pier) • = 2330

  19. Wet Area floor joists

  20. Wet Area floor joists

  21. Wet Area floors

  22. Wet Area floors

  23. Wet Area floors

  24. Wet Area floors

More Related