20 likes | 119 Views
IM and IM-DF connection test status. Status : Test @ FNAL (IM and DF with DF mini backplane) IM worked on DF. Low speed data transfer test was succeeded. Required data transfer speed (DDR200 MHz) was not stable due to the IM power generator problem.
E N D
IM and IM-DF connection test status • Status : • Test @ FNAL (IM and DF with DF mini backplane) • IM worked on DF. Low speed data transfer test was succeeded. • Required data transfer speed (DDR200 MHz) was not stable due to the IM power generator problem. • Test @ Waseda (IM and DF with DF mini backplane) • After replacement of power generator, required speed (DDR 200 MHz) was accomplished with channel delay. • Now we are testing the data flow around IM (i.e. QUEST->IM->DF test) with pseudo data. Test Setup @ Waseda Readout by I2C • Plan : • Test @ waseda • Finish IM data flow test in Nov. • New IMx10 (power gen replaced and minor change) available at Dec. • Final IM data flow test with new IM and new FW inDec. • Test @ CERN ( IM and DF with ATCA) • IM data flow will be tested with DF on ATCA , with pseudo data(Lab4) and read ROD data (P1) inJan and Feb. JTAG for DF DATA from QUEST JTAG for IM
Some Picture Full IM mounted DF IMx4 DF in ATCA (not tested)