1 / 13

Influence of Signal Recycling on Virgo Sensitivity Curve Optimization

Learn about the impact of Signal Recycling on the sensitivity of Virgo, a key factor in optimizing the sensitivity curve and detecting high-frequency signals. Explore the research and development at LAL and discover the strategies and R&D initiatives involved in enhancing Virgo's performance. Collaborations, simulations, and future advancements are discussed to improve signal detection in Virgo detectors.

carolf
Download Presentation

Influence of Signal Recycling on Virgo Sensitivity Curve Optimization

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Signal recycling R&D at LAL: Influence in Virgo Matteo Barsuglia CNRS/IN2P3 - LAL Orsay ILIAS, Padova January 28th 2005

  2. Virgo AdvVirgo AdvVirgo with SR SR: influence on the sensitivity curve Sensitivity (/Hz1/2) (M.Punturo) Arm finesse = 600 fsr = 800 Hz rsr = 0.95 Frequency (Hz)

  3. Signal recycling: optimization at 1 kHz (*) = mirror TN @ 1kHz

  4. Signal recycling at high frequency Sensitivity optimized at different frequencies • Why HF sensitivity ? • HF periodic sources (?) • HF bursts (?) • Black Hole Ringdowns Virgo and Virgo FS factor 10 Virgo + SR • 10 Mo BH with maximal rotation •  rings at about 3 kHz • 3 Mo Schwarzschild BH •  rings at about 4 kHz Virgo FS + SR

  5. SR: influence in Virgo sensitivity • Impact in an advanced Virgo detector • SR has to be first compared with other shot-noise reduction (laser power, recycling factor, finesse) • The influence depends widely from the thermal noise reduction • Need and overall design for an advanced Virgo

  6. Virgo central area Power recycling West input Beam splitter North input Laser beam Space for signal recycling suspension ITF output “dark port”

  7. Why not? • Control problems • longitudinal: 5 dof instead 4) • autoalignment more complex • R&D needed • demonstrate lock acquisition and linear control • demonstrate autoalignment • Extra hardware • second,third phase modulation / second beam / low finesse locks… • control system more poweful and faster

  8. What R&D does it mean for SR? • propose locking/autoalignment strategies • test-them with simulation (frequency domain and time domain) • Build a prototype – acquire experience

  9. SR in the world • Table top interferometers with dual rec and FP in the arms (Australia, Caltech, Florida): principle, first control tests • GEO600, Hannover: dual recycling, no FP in the arms • locked, noise hunting in progress • 40m, Caltech • 5 dof controlled (not in the final configuration) • as close as possible to advanced LIGO

  10. Which prototype? • Suspended prototype at LAL was studied initially and excluded (~ 2002) • Attention given to the Glasgow group (~ 2003) • dual rec FP ITF project delayed/cancelled • GEO: great experience (contact: ILIAS-WG1) • Attention to 40m@Caltech prototype: the closest to the optical scheme of an advanced Virgo (~ 2004)  collaboration with Caltech

  11. Collaboration LAL- 40m@Caltech • Founded by EGO • travels • post-doc ( M.Varvella, 2Y post-doc, during 2005 based in Caltech) • Goal of the collaboration: • Collaboration on the 40m/Adv LIGO simulation  Have a simulation package for Virgo/SR • Follow the 40m commissioning  transfer the experience and ideas to Virgo

  12. 2005 activity • Participation to the LIGO-40m simulation group • e2e simulation of 40m/adv LIGO • Improvement of the speed: re-summation cavity • Start a signal recycling package for Virgo/SR

  13. Future • Configurations and scientific impact: • Prepare an overall design for Virgo/SR (Virgo white paper) • Control and simulation: • Follow the locking ideas used in the 40m and GEO • Use the simulation packages and ideas developed in the 40m/Adv LIGO to prepare the Virgo/SR control scheme

More Related