120 likes | 134 Views
Explore the 55-mile Space Coast Loop Trail, a Coast-to-Coast Connector offering a scenic journey from St. Johns River to Sea. Discover the beauty of the Indian River National Scenic Byway and iconic sites like Merritt Island National Wildlife Refuge and Kennedy Space Center.
E N D
Space Coast Loop Trail - Brevard County • SPACE COAST LOOP TRAIL – 55 MILES • Coast to Coast Connector • St. Johns River to Sea Loop • East Coast Greenway • U.S. Department of Interior • America’s Great Outdoors • Indian River National Scenic Byway • America’s Transportation Awards Top 10 Transportation Project 2010 • Merritt Island National Wildlife Refuge • Canaveral National Seashore • NASA/Kennedy Space Center
Space Coast Loop Trail - Brevard County St. Johns River-to-Sea Loop
Kennedy Space Center Gap – C2C Brevard Segment 2 • Kennedy Space Center Gap • PHASE: Feasibility Study complete • Next phase – PD&E following federal NEPA guidelines • BUDGET REQUEST:$450,000 • Budgeted in 2016 work program • FEATURES: Proposed off road route • and rail with trail through • Merritt Island National Wildlife Refuge, • Canaveral National Seashore, and • Kennedy Space Center • ISSUES: Federal funding
Space Coast Loop Trail – Max Brewer Bridge Max Brewer Bridge PHASE: COMPLETE FEATURES: Connections to two regional parks Bike/ped facilities on two sides
Space Coast Gap – Segment 1 • Downtown Connector • LENGTH: 1.9 miles • PHASE: FDOT PD&E • Funded FY 2014/15 • BUDGET: $100,000 • C2C State $ • FEATURES: Connections to downtown, two regional parks, and future train station • ISSUES: Right of way constraints
East Central Florida Regional Rail Trail – Titusville Segment Titusville Crossover Segment LENGTH: 0.6 miles PHASE: Titusville Design/Build Funded FY 2014/15 Design 2015 Construction 2016 FEATURES: Pedestrian bridge across SR 406/Garden Street BUDGET: $3,631,000 FDOT work program/Federal $
East Central Florida Regional Rail Trail – Titusville Segment • Draa Park Segment • LENGTH: 1.4 miles • PHASE: COMPLETE • FEATURES: Neighborhood trail connected to future city park with full service trailhead
East Central Florida Regional Rail Trail Brevard County Rural/Suburban Segment LENGTH: 12.8 miles PHASE: FDOT Design/Build Funded FY 2014/15 Design 2015 Construction 2016 COST: $14.3M State and Federal funding
East Central Florida Regional Rail Trail – Suburban Segment • Suburban Segment • LENGTH: 7.3 miles • FEATURES: • Neighborhood trail • Parallel but off road • CHALLENGES: • Road/driveway crossings • Signage • BUDGET: $6,946,602 • FDOT work program/Federal $
East Central Florida Regional Rail Trail – Rural Segment • Rural Segment • LENGTH: 5.5 miles • FEATURES: • Rural/wilderness trail • Wetlands/ecosystems • Equestrian/trailhead • CHALLENGES: • Emergency response • Bridges/mitigation • Maintenance • BUDGET: $7,356,000 • C2C State $
Coast to Coast Connector - Brevard County Leigh Holt Multi Modal Program Manager Cell: 321-302-5848 Katrina Morrell Multi Modal Communications Specialist Steven Bostel Transportation Analyst Space Coast TPO 2725 Judge Fran Jamieson Way, Bldg. B Melbourne, FL 32940 Office: 321-690-6890 www.spacecoasttpo.com Roads to Rockets…The Sky is NOT the Limit