1 / 5

STF393 Status TTCN-3 Language Maintenance 12-2010

STF393 Status TTCN-3 Language Maintenance 12-2010. Gyorgy Rethy. TTCN-3 maintenance in 2010. STF 393: January (March) 2010 – December 2010 (78 mDays) Members: Gyorgy Rethy , Ericsson Jens Grabowski, University of Goettingen Ina Schieferdecker, Fraunhofer FOKUS Jacob Wieland, TestingTech

carverb
Download Presentation

STF393 Status TTCN-3 Language Maintenance 12-2010

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. STF393 Status TTCN-3 Language Maintenance12-2010 Gyorgy Rethy

  2. TTCN-3 maintenance in 2010 • STF 393: January (March) 2010 – December 2010 (78 mDays) • Members: • Gyorgy Rethy, Ericsson • Jens Grabowski, University of Goettingen • Ina Schieferdecker, Fraunhofer FOKUS • Jacob Wieland, TestingTech • Benjamin Zeiss, University of Goettingen • Sessions • 22–26 March 2010 • 28 June–02 July 2010 • 30 August–03 September 2010 • 29 November–02 December 2010 • TTCN-3 deliverables (acc. to ToR) • TTCN-3 language standards, depending on receiving CRs (beginning of 2011) • ES 201 873 parts v4.3.1 • 4 extension packages v1.2.1 • Proforma for TTCN-3 Test Suite v1.2.1, depending on receiving CRs (beg. of 2011) TTCN-3 language maintenance and status

  3. STF 393 - Tasks • Resolution and implementation of CRsScope: • Parts 1 and 4 to 10 of the ES 201 873 series • The 4 extension packages • Proforma for TTCN-3 reference test suite • Cooperation with STF 160 on LTE testing • Preparation of the deliverables for ETSI publicationand the “interim” version for 3GPP TTCN-3 language maintenance and status

  4. STF 393 - Work done • Session 22-26 March 2010 • Resolved/closed CRs: 23 (of those 1 rejected) • In addition: resolved CRs has been added to edition v4.2.1, therefore part of the STF work has already been approved • Session 28 June-02 July 2010 • Resolved/closed CRs: 18 (of those 9 has been included into Part-1 v4.2.2) • The „interim“ version v4.2.2 (the core only) has been prepared and made available on the ETSI server, in MTS‘s drafts area • Session 30 August-03 September 2010 • Resolved/closed CRs: 18 • Session 29 November-02 December 2010 • Resolved/closed CRs: 36 • Assigned (target is v4.3.1/v1.2.1): 17 • Remaining CRs, scheduled for 2011: 21 TTCN-3 language maintenance and status

  5. STF 393 – Drafts under preparation for approval • TTCN-3 Part-1: Core Language V4.3.1 (39 CRs) • TTCN-3 Part-4: Operational Semantics V4.3.1 • TTCN-3 Part-5: TTCN-3 Runtime Interface V4.3.1 (3 CRs) • TTCN-3 Part-6: TTCN-3 Control Interface V4.3.1 (8 CRs) • TTCN-3 Part-7: Using ASN.1 with TTCN-3 V4.3.1 (1 CR) • TTCN-3 Part-8: Using IDL with TTCN-3 V4.3.1 (1 CR) • TTCN-3 Part-9: Using XML with TTCN-3 V4.3.1 (8 CRs) • TTCN-3 Part-10: TTCN-3 docum. tags V4.3.1 (4 CRs) • Ext. pack: Advanced Parameterization V1.2.1 (2 CRs) • Ext. pack: Behaviour Types V1.2.1 (3 CRs) • Ext. pack: Test Conf. and Depl. Support V1.2.1 (1 CR) Already approved: • Ext. pack: TTCN-3 Reference test suite V1.1.1 No CR resolved: • Ext. pack: Real-Time and Performance Testing TTCN-3 language maintenance and status

More Related