50 likes | 69 Views
STF393 Status TTCN-3 Language Maintenance 12-2010. Gyorgy Rethy. TTCN-3 maintenance in 2010. STF 393: January (March) 2010 – December 2010 (78 mDays) Members: Gyorgy Rethy , Ericsson Jens Grabowski, University of Goettingen Ina Schieferdecker, Fraunhofer FOKUS Jacob Wieland, TestingTech
E N D
STF393 Status TTCN-3 Language Maintenance12-2010 Gyorgy Rethy
TTCN-3 maintenance in 2010 • STF 393: January (March) 2010 – December 2010 (78 mDays) • Members: • Gyorgy Rethy, Ericsson • Jens Grabowski, University of Goettingen • Ina Schieferdecker, Fraunhofer FOKUS • Jacob Wieland, TestingTech • Benjamin Zeiss, University of Goettingen • Sessions • 22–26 March 2010 • 28 June–02 July 2010 • 30 August–03 September 2010 • 29 November–02 December 2010 • TTCN-3 deliverables (acc. to ToR) • TTCN-3 language standards, depending on receiving CRs (beginning of 2011) • ES 201 873 parts v4.3.1 • 4 extension packages v1.2.1 • Proforma for TTCN-3 Test Suite v1.2.1, depending on receiving CRs (beg. of 2011) TTCN-3 language maintenance and status
STF 393 - Tasks • Resolution and implementation of CRsScope: • Parts 1 and 4 to 10 of the ES 201 873 series • The 4 extension packages • Proforma for TTCN-3 reference test suite • Cooperation with STF 160 on LTE testing • Preparation of the deliverables for ETSI publicationand the “interim” version for 3GPP TTCN-3 language maintenance and status
STF 393 - Work done • Session 22-26 March 2010 • Resolved/closed CRs: 23 (of those 1 rejected) • In addition: resolved CRs has been added to edition v4.2.1, therefore part of the STF work has already been approved • Session 28 June-02 July 2010 • Resolved/closed CRs: 18 (of those 9 has been included into Part-1 v4.2.2) • The „interim“ version v4.2.2 (the core only) has been prepared and made available on the ETSI server, in MTS‘s drafts area • Session 30 August-03 September 2010 • Resolved/closed CRs: 18 • Session 29 November-02 December 2010 • Resolved/closed CRs: 36 • Assigned (target is v4.3.1/v1.2.1): 17 • Remaining CRs, scheduled for 2011: 21 TTCN-3 language maintenance and status
STF 393 – Drafts under preparation for approval • TTCN-3 Part-1: Core Language V4.3.1 (39 CRs) • TTCN-3 Part-4: Operational Semantics V4.3.1 • TTCN-3 Part-5: TTCN-3 Runtime Interface V4.3.1 (3 CRs) • TTCN-3 Part-6: TTCN-3 Control Interface V4.3.1 (8 CRs) • TTCN-3 Part-7: Using ASN.1 with TTCN-3 V4.3.1 (1 CR) • TTCN-3 Part-8: Using IDL with TTCN-3 V4.3.1 (1 CR) • TTCN-3 Part-9: Using XML with TTCN-3 V4.3.1 (8 CRs) • TTCN-3 Part-10: TTCN-3 docum. tags V4.3.1 (4 CRs) • Ext. pack: Advanced Parameterization V1.2.1 (2 CRs) • Ext. pack: Behaviour Types V1.2.1 (3 CRs) • Ext. pack: Test Conf. and Depl. Support V1.2.1 (1 CR) Already approved: • Ext. pack: TTCN-3 Reference test suite V1.1.1 No CR resolved: • Ext. pack: Real-Time and Performance Testing TTCN-3 language maintenance and status