1 / 56

IDACS / NCIC 2000

IDACS / NCIC 2000 . Migration to the new System and Network………. Introduction. IDACS/NCIC 2000 Project Team – Major Fred Pryor, ISP Dave Smith, IDACS/NCIC 2000 Project Manager dsmith3@isp.state.in.us Jim Cole, Datamaxx Project Manager Dennis Eaton, ISP Systems & Programming / IDACS ISO

cashlin
Download Presentation

IDACS / NCIC 2000

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. IDACS / NCIC 2000 Migration to the new System and Network……….

  2. Introduction • IDACS/NCIC 2000 Project Team – • Major Fred Pryor, ISP • Dave Smith, IDACS/NCIC 2000 Project Managerdsmith3@isp.state.in.us • Jim Cole, Datamaxx Project Manager • Dennis Eaton, ISP Systems & Programming / IDACS ISO • Michael Paxton, ISP Systems & Programming • Matt Ryan, Intelenet Commissionmryan@intelenet.state.in.us • Charlie Sharp, Intelenet Commissioncsharp@intelenet.state.in.us IDACS / NCIC 2000 Upgrade and Migration

  3. System Overview IDACS / NCIC 2000 Upgrade and Migration

  4. Presentation Agenda • IDACS Upgrade… • Project Status • Network MIGRATION • Workstations • Datamaxx Workstation Client • Network Overview • System Security • Interface specifications IDACS- Open FOX message switch • Regional Systems, 3rd Party Vendor provided systems (CAD, MDT, RMS etc.) IDACS / NCIC 2000 Upgrade and Migration

  5. Project Status • Project Status • 5 Phases – contract execution, design, development, deployment and acceptance. • We’re in Phase II – the most important of all phases…… • Timeline – remaining • May 31 – October 15 • Programming – State Police & Datamaxx/CPI Open FOX • Network Upgrade – through February 2004 • Implementation • Deployment/installation of Workstation Clients • Cutover to new IDACS System for Live Operation IDACS / NCIC 2000 Upgrade and Migration

  6. Network Migration Intelenet Commission

  7. Network Migration • The Pressing Questions … • How do agencies and departments go about this Migration? • What does that involve? • What is it going to cost? • How do I do it?..… IDACS / NCIC 2000 Upgrade and Migration

  8. Network Migration • How do agencies and departments go about this migration? • IDACS - continued support of existing network for 2 years from March 1, 2002. • Requires a new telco managed circuit… Replaces your current IDACS circuit and modem • Intelenet Commission - • Service of the Indiana Telecommunications Network (ITN) • Partnership between the Intelenet Commission and it’s business partners (AT&T and Ihets). • Private Network, only serving the public sector. Customers Include K-12, Higher Ed, State Libraries, State Government. IDACS / NCIC 2000 Upgrade and Migration

  9. Network Migration • Intelenet Commission – cont’d • 56 Kilobit Frame Relay Service includes • 24 x 7 help desk support through ITN. Always on, no dialing up required. • Router is included with the service. • Guaranteed 32 Kilobit Committed Information Rate (CIR) at all times. IDACS / NCIC 2000 Upgrade and Migration

  10. Network Migration • What does that involve? • Installation of new IDACS telco service • Service will be ordered through the Intelenet Commission. • All customer information will be taken at that time. Allow a minimum of 40 days for the service to be installed. • Installation will consist of the circuit install (local telco), demarc extension, and router install (ITN contractors). Up to three site visits. IDACS / NCIC 2000 Upgrade and Migration

  11. Network Migration • What is it going to cost? • Monthly Recurring Cost (projected) • The quicker the service is adopted by IDACS users, the lower the MRC should be. Monthly recurring cost will NOT exceed $500.00, however. • Non-Recurring Costs • $1,500 Installation Charge. • $435.00 Demarc Extension Charge (if required). • Core or wall penetrations on a $per quote basis. IDACS / NCIC 2000 Upgrade and Migration

  12. Network Migration • How do I do it? • Contact Information • To order service/provisioning information: • Lynn Jefferson, Customer Service Specialist (317) 234-1427.ljefferson@intelenet.state.in.us • Questions/Comments regarding 56K frame service or Intelenet/Indiana Telecommunications Network: • Matt Ryan, Manager, Network Services (317) 233-8874.mryan@intelenet.state.in.us • Charlie Sharp, Director of Operations (317) 233-8997.csharp@intelenet.state.in.us IDACS / NCIC 2000 Upgrade and Migration

  13. Workstations ISP Project Management

  14. Workstations • What will work on the system? • Time for a quick needs “analysis”… • What are you using today? • What are you planning for the future? CAD, RMS, mobile data devices? • IDACS NCIC 2000 • Standalone “terminal agency” can use… • Hardware/Operating System – almost any Pentium based PC,…. Windows 95, 98, or Windows 2000. (Windows 2000 Professional preferred operating system, provides a better level of security.) IDACS / NCIC 2000 Upgrade and Migration

  15. Workstations • Standalone “terminal agency” can use…cont’d • Common off-the shelf – “get’em at a local office supply” – product – Dell, Gateway, HP, NEC, with a minimum: • Pentium III / IV processor… • 128 MB RAM • 20 G byte hard drive (standard minimum) • 10/100 M Byte PCI Ethernet network card • Monitors – again, … off the shelf - 15” – 21” .28 up to.24AG Trinitron Monitors, 15” flat panel displays to the 19” Digital Flat Panel displays.. • ***Performance Considerations*** • What else are you going to run on it ?!?!? • Presentation later on the platform selected for ISP use. Get some IDEAS! IDACS / NCIC 2000 Upgrade and Migration

  16. Network Overview ISP Systems and Programming

  17. Network Overview IDACS / NCIC 2000 Upgrade and Migration

  18. Network Overview IDACS / NCIC 2000 Upgrade and Migration

  19. Network Overview IDACS / NCIC 2000 Upgrade and Migration

  20. Network Overview Diagram Here!……………. IDACS / NCIC 2000 Upgrade and Migration

  21. System Security IDACS Information Security Officer (ISO)

  22. System Security • Site Security • Site must have adequate physical security to protect equipment and data. • Visitors must be accompanied by staff. • Personnel restricted to authorized persons. • Documented procedures to monitor security. • Terminal use for authorized purposes. • Procedures for changing of passwords. IDACS / NCIC 2000 Upgrade and Migration

  23. System Security • Personnel • Check state/national fugitive/arrest files. • If record found, delay access pending further review. • Felony/serious misdemeanors referred to CTA or designee. • Notice to employer with disposition. IDACS / NCIC 2000 Upgrade and Migration

  24. System Security – Technical • Dial-up Access • Properly managed ports and other security measures. • Develop and maintain documentation of security measures. • Identify and authenticate dial-in users. • Transaction logs of activity. • Each individual shall be uniquely identified. (i.e. name, badge, serial, or other unique number.) • CTA and Computer Center automated logging. IDACS / NCIC 2000 Upgrade and Migration

  25. System Security – Technical • Authentication Strategy • Centralize oversight. • Decentralize day-to-day and administration of computer centers. IDACS / NCIC 2000 Upgrade and Migration

  26. System Security – Technical • Encryption • Any use of a public network segment must be encrypted. (includes wireless, dial-up, or Internet). • session-based or VPN’s. • private-key (FIPS Publication 46-2). • DES (ANSI X3.92, ANSI X3.106, FIPS Publication 81.) • FBI responsible for FBI to CTA. • CTA responsible for CTA to Computer Centers. IDACS / NCIC 2000 Upgrade and Migration

  27. System Security – Technical • Encryption – cont’d • Ensure correct, legal, efficient dissemination • Copies of III data must be secured. • Audit considerations. • CTA to document and oversee encryption key management procedures. IDACS / NCIC 2000 Upgrade and Migration

  28. System Security – Technical • Internet • advanced authentication. • access control. • integrity. • confidentiality. • non-repudiation. • firewall protection. IDACS / NCIC 2000 Upgrade and Migration

  29. Interface Specifications ISP Project Management

  30. Interface Specifications • DMPP-2020: Communications Interface • Provides • Guaranteed delivery • Application-level message headers • “Data-stream” format communication • DSEO-2020: Embedded Objects • Provides • Standard method of image exchange • Platform independence • Compatibility with DMPP-2020 IDACS / NCIC 2000 Upgrade and Migration

  31. Next Steps … • When can I begin the process? • …budget issues are the driving force. …”I have two years, …but can I wait?” Who else is on my circuit that may leave – potentially increasing my line costs…..? • Plan for your workstation…. • Plan for network upgrade… • initial contacts with Intelenet - circuit, router installation- • Do I need the (IDACS software)? • Will the IDACS staff be available for questions or assistance? IDACS / NCIC 2000 Upgrade and Migration

  32. Datamaxx Client • Datamaxx – Prime Vendor • Datamaxx – a leader in criminal justice information systems integration. • Desktop client application • Contract – 10,000 user licenses for the Datamaxx client, OmniForce • No cost to the local agencies wishing to deploy to their desktops. • Window’s like look and feel. Not “Windows” however… • Demonstration – • Computer Projects, Inc. (CPI) Open Fox message switching system (IDACS). IDACS / NCIC 2000 Upgrade and Migration

  33. Demonstrations • IDACS Workstation • State Police Districts / GHQ • DATAMAXX Workstation Client • OmniForce IDACS / NCIC 2000 Upgrade and Migration

  34. Datamaxx Demonstration Datamaxx Project Management

  35. Omniforce Client • Fourth generation of software • Not “1.uh-oh” version • Uses internet technology, but it is NOT a browser • Industry-standard components • All necessary modules download automatically • Updates itself automatically • Platform independent • Windows 2000 Professional preferred IDACS / NCIC 2000 Upgrade and Migration

  36. The workstation client is automatically updated with new forms each time the application is started. IDACS / NCIC 2000 Upgrade and Migration

  37. The workstation client is shown below in its initial state without any transaction forms or windows open. IDACS / NCIC 2000 Upgrade and Migration

  38. The forms menu provides access to all transaction forms available to the user… IDACS / NCIC 2000 Upgrade and Migration

  39. The menu panels will cascade as the user narrows their selection from the choices available to them. IDACS / NCIC 2000 Upgrade and Migration

  40. Selecting the appropriate transaction will close the menu and open the desired transaction form. Note: default information is pre-loaded into transaction fields. IDACS / NCIC 2000 Upgrade and Migration

  41. The user completes the transaction by entering data into the transaction data fields IDACS / NCIC 2000 Upgrade and Migration

  42. For any field that is validated by a value list, the user may access a list of field values by clicking the value list control. Field Value List Control IDACS / NCIC 2000 Upgrade and Migration

  43. After selecting a value from the list, the correct data is inserted into the data field. Note: If the user knows the appropriate data value for a field they may type it directly into the field without using the data list. IDACS / NCIC 2000 Upgrade and Migration

  44. As the user enters data into the fields, the system automatically checks to ensure that only valid values are entered… IDACS / NCIC 2000 Upgrade and Migration

  45. Entering an incorrect value into a field causes an error dialog to be displayed. Note: The Error Dialog can be over ridden if the value is correct, but has not been identified to the system validation tables. IDACS / NCIC 2000 Upgrade and Migration

  46. After entering all available data, the user transmits the transaction by clicking the “Transmit” control. Transmit Control IDACS / NCIC 2000 Upgrade and Migration

  47. The system does a final check to ensure that all data fields are accurate and required fields contain data. IDACS / NCIC 2000 Upgrade and Migration

  48. After all validation has been passed, the user once again transmits the message to the network. IDACS / NCIC 2000 Upgrade and Migration

  49. After transmitting, the Message Window is opened allowing the operator to review responses. IDACS / NCIC 2000 Upgrade and Migration

  50. Double-clicking any of the messages in the Message Window will display the full content of the message. IDACS / NCIC 2000 Upgrade and Migration

More Related