An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Smart Infrastructure Manual: Design and Construction Training and awareness sessions Allan O’Connor & James Byrne Directorate of Energy Efficiency, Environmental Resource Management and Sustainability (DEEERMS)

  2. Smart Infrastructure Reducing WOL cost Building corporate knowledge Principles Objectives • State ESD and WOL minimum requirements • Consistent assessment of design options • Define and streamline reporting requirements to monitor ESD and WOL • Facilitate performance monitoring over WOL • Build corporate knowledge

  3. Smart Infrastructure What is it? • Manual and Checklist • Design and construction minimum requirements • Reporting requirements • ESD and WOL guidance • Evolving document • Endorsed by DGCFI, HI and Deputy Secretary

  4. Smart Infrastructure Application • Applied to all projects in the Facilities & Infrastructure Program (FIP). • All clauses shall be addressed • Design Brief can exclude where not applicable • Clauses that cannot be met or are deemed not applicable are justified • Every project reports using the Checklist

  5. Smart Infrastructure Project Development Touch Points

  6. Smart Infrastructure Project Development Touch Points Project Delivery Touch Points

  7. Smart Infrastructure Project Delivery Touch Points Operation Metering/Commissioning Ongoing focus of DEEERMS to get meters correctly installed, commissioned and connected to RDMS.

  8. As-Constructed Metering Strategy Construct Y MJ/m2 Construction waste recycling and reuse percentage achieved against pre-construction target Post Occupancy Evaluation Report Operate Z MJ/m2 Smart Infrastructure What does DEEERMS need to see? Progressive submission Checklist and Metering Strategy (PRAP) Design X MJ/m2 Final Checklist and MeteringStrategy PMCA (or CFI PO) submit viaSmart.Infrastructure@defence.gov.au

  9. Smart Infrastructure Manual: Design and Construction DEEERMS are happy to help Smart.Infrastructure@defence.gov.au Questions? Natural lighting and high efficiency lighting, Warehouse, RAAF Base Amberley