380 likes | 394 Views
Explore the challenges and innovations in using DEMs for watershed delineation with the L-THIA model. Learn how to enhance efficiency and accuracy in determining runoff and NPS effects. Access tools for editing land use categories and applying BMPs. Stay informed about issues and solutions to DEM-related problems. Follow the journey of improving watershed calculations.
E N D
LTHIA and Online Watershed Delineation- Tale of a DEM consumer Larry Theller ,Bernie Engel, and Tong Zhai Purdue University Agricultural and Biological Engineering Dept. theller@purdue.edu March 13, 2007 Indiana GIS conference Workshops
Presentation Overview • L-THIA (Long-Term Hydrologic Impact Assessment) model • WWW watershed delineation • Behind the scenes for Region 5 • Issues encountered
L-THIA Based on the rainfall – land cover – runoff analysis method already used in many communities (TR55) Input: Land Use + Soils Information Process: Daily Runoff and Pollutant Loading Calculations (30 years of local rainfall) Output: Average Annual Runoff and NPS loads for each specific land use pattern
Watershed delineation • DEM comes into play to determine the contributing area • Use “watershed” to categorize the landuse and soil • Each landuse-soil combination has a specific impact on runoff chemistry • Calculate NPS effects based on curve numbers
Click this button. • Click along a stream segment. + Turn on aerial photos.
Selected characteristics available as tables for viewing or map layers. Includes tools to download raster layers of land use, hydrologic soil, curve number, and shapefile of watershed boundary.
Program reformats characteristics of the watershed as needed for several models
Click “Online Digitizing” button to start edit session.
Edit landuse category or apply a BMP to change curve number method.
Watershed Characteristics are prepared as inputs to several models, using original and edited as separate scenarios.
Results include tables and graphics of runoff volume and characteristics.
Behind the scenes • Math is too slow without prepared layers • Flow direction, flowpath precalculated. • Large rasters (landuse, soils) are tiled to speed access • 8 –digit watersheds chosen as tile size
For each 8-digit watershed an Arc Info script clips landuse, soils, DEM then burns-in streams, runs delineation to get flow direction, flow accumulation, flowpath, and does miscellaneous reformat and cleanup.
Issues with DEMs and Delineations • “Noise” in data, particularly Indiana • Water in features vs DEM low spots • Tiger 95 / Census 2000 water versus NHD • “Water” in landuse vs in STATSGO Soil
Major area of unreported “Glacial Grooves?” Original USGS NED DEM and Hillshade
Add quadrangles and note exact fit. Original USGS NED DEM and Hillshade
Note sharp edge along quad lines. Original USGS NED DEM
Flowpath of water will follow the “grooves.” 2003 Orthophotos and Hillshade
Without funding to repair the USGS NED DEM, our approach was to warn users that in some areas the watershed calculated from the DEM was not reliable.
“Noise” is gone! Indiana Geological Survey revised NED DEM
Burning Issues… • DEMS can be so detailed that they cause problems. • In flat areas it is critical to “burn in” physical path to get correct logical flow
Area 1 Our Calculated Flow (black arrows) runs backwards along Calumet SAG channel. This impacts all the way to Area 1 in Illinois
We discovered that the IGS DEM has road embankments in it which are not being fully cut when the streams are burned-in. One acting like a dam on the flat SAG channel backs water up into Indiana from Illinois.
This area shows the problem, as lakes east of the Interstate flow wrong way, to the north.
The Interstate clearly forms a “dam” (dotted lines) in the DEM. Original model flow depicted.
Flow from the east side is blocked by the interstate and forced to go north to the lake. Aerials clearly show flow passing under the bridge going to west. Stream layer was edited to burn a channel into the east lakes and the bridge was “pitted” to also cut the embankment. Flow shown is BEFORE repairs, and goes east.
After adding the hydraulic connection under the Interstate the lakes all drain to the west. Final flow depicted.
Thanks • Questions?