1 / 5

Fuel Your Success Master C_TS422_2021 Exam for SAP Certified Application Associate - SAP S4HANA Production Planning and

Elevate your career with the C_TS422_2021 exam, tailored for SAP Certified Application Associate in SAP S/4HANA Production Planning and Manufacturing. Unleash the power of SAP S/4HANA 2021, specializing in advanced Production Planning and Manufacturing solutions. Our comprehensive study guide empowers you with essential skills for success. Dive into the intricacies of SAP Production Planning, explore cutting-edge Manufacturing methodologies, and conquer the certification with confidence.<br>https://www.certsgrade.com/pdf/C_TS422_2021/

certsgrade
Download Presentation

Fuel Your Success Master C_TS422_2021 Exam for SAP Certified Application Associate - SAP S4HANA Production Planning and

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. C E R T S GR A DE High Grade and Valuable Preparation Stuff High Grade and Valuable Preparation Stuff SAP C_TS422_2021 SAP Certified Application Associate - SAP S/4HANA Production Planning and Manufacturing Questions And Answers PDF Format: For More Information – Visit link below: https://www.certsgrade.com/ Version = Version = Product Visit us athttps://www.certsgrade.com/pdf/c_ts422_2021/

  2. Latest Version: 6.0 Question: 1 When working with bouth cross-plant and plant-specific material statuses n the material master, which statuses has the higest priority? A. The cross-plant status B. The plant-specific status C. The last restrictive status D. The most restrictive status Answer: D Question: 2 Advanced Planning uses master data and transaction data from SAP S/4HAN A. In which data objects can you set the advanced planning flag? A. Work center B. Production version C. Plant D. Material Answer: A, D Question: 3 Which SAP solutions support the supplier area in the portfolio of the Digital Value Network? A. SAP Ariba B. SAP Hybris C. SAP Concur D. SAP Fieldglass E. SAP SuccessFactors Answer: A, C, D Question: 4 Visit us athttps://www.certsgrade.com/pdf/c_ts422_2021/

  3. What is the purpose of a reporting point confirmation in repetitive manufacturing? A. To stage different components for a production line simultaneously B. To determine the work in progress along the production line C. To reduce the total production lead time for along production line D. To provide timely updates of inventory management for the staged components Answer: B, D Question: 5 Which time elements are part of a routing operation? A. Pick/pack time B. Float before production C. Queue time D. Wait time E. Move time Answer: A, C, D Question: 6 Your company produces a finished good based on a forecast and expects it to being stock when customers order it. If customers order more than the forecasted quantity, the production quantity should be increased to try to meet the extra demand. Which planning strategy do you use? A. Planning with final assembly (40) B. Make-to-order production (20) C. Make-to-stock production (10) D. Planning without final assembly (50) Answer: A Question: 7 Which actions does the system preform by default when you save a confirmation for a finished product in repetitive manufacturing? A. Posting of production costs to the production cost collector B. Material staging for nex order in sequence C. Archiving of documents for assembly scrap Visit us athttps://www.certsgrade.com/pdf/c_ts422_2021/

  4. C. Posting of goods receipt for the product D. Reduction of associated capacity requirements Answer: A, D, E Question: 8 Where do you maintain the work center that represents the production line for repetitive manufacturing? A. Production version B. Routing C. Repetitive manufacturing profile D. Production cost collector Answer: A, B Question: 9 Which of the following questions do you have to answer before you start creating a BOM? A. In which storage location is the BOM required? B. Which Valid To information is necessary? C. Is the material type allowed in the BOM? D. What status does the BOM have? Answer: B, C Question: 10 Why would you use phantom assemblies? A. To simplify the structure of bills of materials B. To make the assignment of components easier C. To reduce the number of changes required in bills of materials D. To reduce the number of material masters E. To increase the number of planning levels Answer: A, B, C Visit us athttps://www.certsgrade.com/pdf/c_ts422_2021/

  5. For More Information – Visit link below: http://www.certsgrade.com/ PRODUCT FEATURES 100% Money Back Guarantee 90 Days Free updates Special Discounts on Bulk Orders Guaranteed Success 50,000 Satisfied Customers 100% Secure Shopping Privacy Policy Refund Policy Discount Coupon Code: CERTSGRADE10 Visit us athttps://www.certsgrade.com/pdf/c_ts422_2021/ Powered by TCPDF (www.tcpdf.org)

More Related