1 / 6

Revolutionize Deployment D-PEMX-DY-23 Dell Technologies PowerEdge MX Modular Deploy 2023 Exam – Master Modular Data Cent

Elevate your career with the D-PEMX-DY-23 Dell Technologies PowerEdge MX Modular Deploy 2023 Exam. Revolutionize deployment and master the intricacies of PowerEdge MX for unparalleled success in modular data center solutions. Our comprehensive study materials and expert-guided training empower you to revolutionize IT infrastructure deployment, ensuring you are well-equipped for the challenges of modern data centers. Prepare efficiently with our curated resources, including study guides, practice exams, and real-world scenarios.<br>https://www.certsgrade.com/pdf/D-PEMX-DY-23/

certsgrade
Download Presentation

Revolutionize Deployment D-PEMX-DY-23 Dell Technologies PowerEdge MX Modular Deploy 2023 Exam – Master Modular Data Cent

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Dell EMC D-PEMX-DY-23 Dell Technologies PowerEdge MX Modular Deploy 2023 Questions And Answers PDF Format: For More Information – Visit link below: https://www.certsgrade.com/ Version = Version = Product Visit us athttps://www.certsgrade.com/pdf/d-pemx-dy-23/

  2. Latest Version: 6.0 Question: 1 A system administrator wants to disable Lockdown Mode. Which interface should be used? Response: A.iSM Interface B.iDRAC UI C.TPM Interface D.BIOS Answer: B Question: 2 A customer would like to periodically change the iDRAC root password on all the servers in their MCM Group. What feature in OME-M should they use? Response: A.SupportAssist B.Resource Pools C.Quick Deploy D.Chassis Deployment Wizard Answer: C Question: 3 To which component can a firmware update be applied without affecting any applications running on the server? Response: A.NIC B.RAID Controller C.BIOS D.iDRAC Answer: D Visit us athttps://www.certsgrade.com/pdf/d-pemx-dy-23/

  3. Question: 4 What type of power cord connects to the PSU side of a PowerEdge MX7000? Response: A.C13 B.C15 C.C15 D.C21 Answer: D Question: 5 Which ports will be active in an MX9116n FSE if there are dual-port NICs in all the server sleds? Response: A.even-numbered server-facing ports B.server-facing ports 9–16 C.odd-numbered server-facing ports D.server-facing ports 1–8 Answer: C Question: 6 How are double-width compute sleds on the MX7000 numbered from the front? Response: A.As 1, 3, 5, and 7, top to bottom B.From 1 to 8, left to right C.From 1 to 8, top to bottom D.As 1, 3, 5, and 7 left to right Answer: D Question: 7 When a SAS IOM is power cycled, how much time does it take for the storage-IOM to display mapping information? Visit us athttps://www.certsgrade.com/pdf/d-pemx-dy-23/

  4. Response: A.300 seconds B.400 seconds C.500 seconds D.600 seconds Answer: A Question: 8 In SmartFabric mode, what is the recommended maximum number of VLANs per server port on an MX7000 switch? Response: A.256 B.512 C.1024 D.1536 Answer: B Question: 9 A customer wants to change the switch operating mode from SmartFabric mode to Full Switch mode. After deleting the fabric in OME-M, what configuration is retained on the switch? Response: A.admin password, hostname, management IP Address, and the VLT domain configuration B.admin password, hostname, and management IP Address C.admin password, hostname, management IP Address, and all port breakout configuration D.admin password, hostname, management IP Address, and the VLAN database Answer: B Question: 10 An administrator is receiving notifications about insufficient power for a PowerEdge MX7000 chassis. The chassis is fed from two different power grids. What is the best policy to maximize power and maintain uptime? Response: Visit us athttps://www.certsgrade.com/pdf/d-pemx-dy-23/

  5. A.PSU Pairing B.Grid Redundancy C.PSU Redundancy D.No Redundancy Answer: D Visit us athttps://www.certsgrade.com/pdf/d-pemx-dy-23/

  6. For More Information – Visit link below: https://www.certsgrade.com/ PRODUCT FEATURES 100% Money Back Guarantee 90 Days Free updates Special Discounts on Bulk Orders Guaranteed Success 50,000 Satisfied Customers 100% Secure Shopping Privacy Policy Refund Policy 16 USD Discount Coupon Code: NB4XKTMZ Visit us athttps://www.certsgrade.com/pdf/d-pemx-dy-23/ Powered by TCPDF (www.tcpdf.org)

More Related