Elevate your career with the C_TS422_2022 exam, designed for SAP Certified Application Associate in SAP S/4HANA Production Planning and Manufacturing. Unleash the power of SAP S/4HANA 2022, specializing in advanced Production Planning and Manufacturing solutions. Our comprehensive study guide empowers you with essential skills for success. Dive into the intricacies of SAP Production Planning, explore cutting-edge Manufacturing methodologies, and conquer the certification with confidence.<br>https://www.certsgrade.com/pdf/C_TS422_2022/
E N D
SAP C_TS422_2022 SAP Certified Application Associate - SAP S/4HANA Production Planning and Manufacturing Questions And Answers PDF Format: For More Information – Visit link below: https://www.certsgrade.com/ Version = Version = Product Visit us athttps://www.certsgrade.com/pdf/c_ts422_2022/
Latest Version: 6.0 Question: 1 Why would you use phantom assemblies? Note: There are 3 correct answers to this question. A. To increase the number of planning levels B. To simplify the structure of bills of material C. To reduce the number of material masters D. To make the assignment of components easier E. To reduce the number of changes required in bills of material Answer: B D E Question: 2 Which of the following questions do you have to answer before you start creating a bill of material (BOM)? A. Is the material type allowed in the BOM? B. Which base unit of measure does the material have? C. What status does the BOM have? D. In which storage location is the BOM required? Answer: A B Question: 3 Advanced Planning uses master data and transaction data from SAP S/4HANA In which data objects can you set the Advanced Planning flag? Note: There are 2 correct answers to this question. A. Work Center B. Production Version C. Material D. plant Visit us athttps://www.certsgrade.com/pdf/c_ts422_2022/
Answer: A C Question: 4 What time element of midpoint scheduled operations can be reduced by reduction strategy settings while dispatching? Note: There are 2 correct answers to this question A. Queue B. Teardown time C. Move time D. Setup Time Answer: A C Question: 5 Which time elements are relevant for lead time scheduling of a production order? Note: There are 2 correct answers to this question. A. setup time B. Opening Period C. Float after Production D. Total replenishment lead time Answer: B C Question: 6 For production orders, cost object controlling (COC) can be carried out on an order-related or product- related basis. Which of the following do you have to consider? Note: There are 2 correct answers to this question. A. In pro duct-related COC, all costs are debited and credited to a product cost collector. B. Order-related COC is beneficial in a flexible production environment C. Product-related COC is used in manufacturing for co-products D. In order-related COC, individual production orders do NOT have cost segments. Visit us athttps://www.certsgrade.com/pdf/c_ts422_2022/
Answer: A B Question: 7 You want to trigger in-house production of a semi-finished material before a sales order for the corresponding finished good is received. Which planning strategy supports the consumption of planned independent requirements for the semi-finished material? A. Planning with final assembly (40) B. Production by lot size (30) C. Planning at assembly level (70) D. Make-to-order production (20) Answer: B Question: 8 Which alternative item strategies are available in bills of material (BOMs) in SAP S/4HANA. Note: there are 2 correct answers to this question. A. Manual maintenance B. 100% check C. First in First out (FIFO). D. Simultaneous Answer: A B Question: 9 Which of the following processes lead to an entry in the MRP planning file? Note: There are 3 correct answers to this question. A. Changing the storage bin in warehouse management B. Changing the procurement type in the product master C. Changing the operation times in the production data structure Visit us athttps://www.certsgrade.com/pdf/c_ts422_2022/
D. Changing the stock in inventory management E. Changing the purchasing contract in materials management Answer: B C D Question: 10 What determines whether the planned independent requirements in demand management are consumed by other requirements? Note: There are 2 correct answers to this question. A. Order type B. Planning strategy C. Requirements profile D. Requirements type Answer: B C Visit us athttps://www.certsgrade.com/pdf/c_ts422_2022/
For More Information – Visit link below: https://www.certsgrade.com/ PRODUCT FEATURES 100% Money Back Guarantee 90 Days Free updates Special Discounts on Bulk Orders Guaranteed Success 50,000 Satisfied Customers 100% Secure Shopping Privacy Policy Refund Policy 16 USD Discount Coupon Code: NB4XKTMZ Visit us athttps://www.certsgrade.com/pdf/c_ts422_2022/ Powered by TCPDF (www.tcpdf.org)