SSA Heads Meeting 19-02-2010 Consumer Mobility Operation Haryana Circle

SSA Heads Meeting 19-02-2010 Consumer Mobility Operation Haryana Circle. Pending Performance Certificate & Penalty details. Detailed status of pending half yearly performance certificates of AMCs in Progress as updated on 16/02/2010 is given here:-.

cfrenette
Download Presentation

SSA Heads Meeting 19-02-2010 Consumer Mobility Operation Haryana Circle

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. SSA Heads Meeting19-02-2010 Consumer Mobility Operation Haryana Circle

  2. Pending Performance Certificate & Penalty details

  3. Detailed status of pending half yearly performance certificates of AMCs in Progress as updated on 16/02/2010 is given here:-

  4. 374 CDMA WLL Numbers directly created on HLR • E-Mail about the creation of 374 CDMA WLL Numbers on HLR but not in Billing was received on 23 Oct, 09 from Nodal Centre, Chandigarh. • Till date only 233 CDMA WLL Numbers have been provisioned.

  5. The Count of pending CDMA WLL Numbers which are still to be provisioned corresponding to the respective SSAs are as given below:-

  6. HR CDMA Reconciliation • E-Mail regarding the Reconciliation of HR CDMA WLL Numbers was received on 7 Jan, 2010 from Nodal Centre, Chandigarh. • According to the Reconciliation:- • Total BP Dump = 89741 • Total HLR Dump = 92032 • CDMA WLL Numbers in HLR but not in BP = 3690 • CDMA WLL Numbers in BP but not in HLR = 1398 • ESN Mismatch = 973

  7. Action to be taken by all the concerned MSC/BSC/CCN Incharges as per given instructions is as follows:- • ESN mismatch:-Incorrect ESNs in BP should be corrected according to the ESNs in HLR. • CDMA WLL Numbers In BP, but not in HLR:-Numbers entered in BP should either be created or deleted from HLR. • CDMA WLL Numbers In HLR, but not in BP:-CCN incharges have to acquire the information (i.e. plan, address and Date of Activation) of these numbers and then update the same in CCN so that Billing of these numbers can be done.

  8. The Count of CDMA WLL Numbers which are still to provisioned corresponding to the respective SSAs are as given below :-

  9. STATUS OF RECHARGED CDMA NO'S CONVERTED FROM DNP POSTPAID TO LIFETIME PREPAID

  10. Verification of OYT Deposit of HR Circle • E-Mail regarding the Verification of OYT deposit of HR Circle was received on 23 Nov, 2009 from Nodal Centre, Chandigarh. • It is required to arrange the OYT deposit detail (current deposit amount against each telephone number) so that OYT deposit installments can be adjusted in the forthcoming bills by Nodal Centre .

  11. Compliance is pending from the following SSAs regarding the verification of OYT deposit detail:-

  12. STATUS OF VPT • Compliance pending from the following SSAs regarding 1154 CDMA VPTs which are to be converted from postpaid to prepaid as per instructions from BSNL HQ.

  13. THANK YOU