An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Chilmark Menemsha Harbor Phase 3

  2. Menemsha Boathouse FireJuly 2010

  3. PHASE 1 - 2010 Removal of fire damaged facilities and installation of Concrete Floating Dock.

  4. PHASE 2 - 2011 Construction of Pier Connector and Utilities.

  5. PHASE 3 – FALL 2012 • Replacement of 230 foot Transient Yacht Dock • Replacement of 50 foot Fuel Dock • Various repairs to town docks

  6. 1 Menemsha Harbor Phase 3 LOCATIONS • Transient Dock • Fuel Dock 2

  7. Menemsha Channel

  8. Fuel Dock underwater

  9. Fuel Dock

  10. Transient YACHT DOCK

  11. Yacht Dock Profile

  12. Yacht Dock Pier footprint

  13. Sample Wood Deck Floats

  14. Another Wood Deck Float

  15. Menemsha Basin

  16. Thank You.Special Town Meeting presentation August 6, 2012