1 / 6

Accounting for uncertainty in water management: why and how do we

Accounting for uncertainty in water management: why and how do we. Dirk-I. Müller-Wohlfeil Funen County - Denmark Groundwater department. Outline. Why are tools for uncertainty assessment crucial for water manager’s daily work and in what respect? How are they applied up to now ?

Download Presentation

Accounting for uncertainty in water management: why and how do we

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Accounting for uncertainty in water management: why and how do we Dirk-I. Müller-Wohlfeil Funen County - Denmark Groundwater department

  2. Outline • Why are tools for uncertainty assessment crucial for water manager’s daily work and in what respect? • How are they applied up to now? • Needs for the improvement of current procedures • Focus on output to specify input

  3. Uncertainty assessment is included in modelling Mapping and modelling in groundwater / water resources management in Denmark • Since 1998: Mapping of groundwater vulnerability leading to local action planning for protection of water resources (like WFD) • Geological mappinggroundwater modelling • Politicians and legislation require reliable and crisp administrative units despite fuzziness and uncertainty in data and tools

  4. Applied uncertainty assessments • Effects of parameter uncertainty on particle tracking to delineate groundwater protection areas in space and time Autocal / Ucode / pest • Parameter sensitivity • Optimisation • Uncertainty • Problems still to be agreed upon and clarified: • What time distances should be applied ? • How can particle tracking used to identify most CONTRIBUTING areas?

  5. HarmoniRib Improvement of current procedures • No quality assurance with respect to “representative data” • No standardised guidelines for uncertaintyassessment among the regional authorities • Procedures needto beappliedin an ”iterative way” • Account for various other uncertainties incl. climate change

  6. Conceptual geological models Derivationsimulationmodel Calibration Uncertainty: Water resource modellingfocus on output to define input • Data • Geophysics • Geology • Soils • Weather • Water management 9 layer model (regional requirements) 11-layer model(local requirements) almost samemodelfit • Need to reconsider and extend calibration targets • Sensitivity of the methods with respect to model input • Need to improve gathering and modelling of input data

More Related