1 / 12

User facilities Building 507

HIE-ISOLDE. User facilities Building 507. 3rd HIE ISOLDE Physics Coordination Group meeting CERN, 3 September 2012. Erwin Siesling. User Facilities. Increasing the surface of the Solid State Lab in building B.115 by 120m2:

chaim
Download Presentation

User facilities Building 507

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. HIE-ISOLDE User facilities Building 507 3rd HIE ISOLDE Physics Coordination Group meeting CERN, 3 September 2012 Erwin Siesling

  2. User Facilities • Increasing the surface of the Solid State Lab in building B.115 by 120m2: • For RP safety reasons all solid state activities will be moved from B.275 to B.115 • This will suppress the existing workshop in B.115 and courtyard between B.115 and B.601 • 2. Replace the existing building 507 by a new building / modular cabins: • Ground floor (only accessible from within the surveyed area): • - Labs and workshop • First floor (accessible from outside the surveyed area): • - Data Acquisition rooms • - Meeting room/Visitors Center • - (Kitchen?) • Design study: • Eliseo Perez-Duenas GS/SE

  3. Cost studies new B 507 Use of modular cabins instead of a full concrete building Phase 1: estimate 120kChf 160kChf - dismounting the present building 30kChf - construction permit - adapting the concrete foundation 130kChf Phase 2: estimate 500kChf 520kChf - (non-standard) modular cabins, interconnected and on 2 floors - total surface 420 m2 435 m2 - not taken in account electrical installations, CV, Labo’s, etc. • Advantages: - lower costs • - fast construction • - flexible work floor

  4. User Facilities Present situation (ground floor Jura side): Control room

  5. Solid State Lab 115 1. Increasing the surface of the Solid State Lab in B.115: Control room

  6. Replace building 507 2. Replacing the existing building 507 by a new building - Ground floor (only accessible from within the surveyed area):

  7. Replace building 507 2. Replacing the existing building 507 by a new building - First floor (accessible from outside the surveyed area):

  8. New building 508

  9. Situation

  10. Cabins on 2 floors

  11. First draft

  12. Corrected – for discussion Free access Controlled access Controlled area

More Related