3.4 Linear Programming

3.4 Linear Programming. Objectives: 1.) To find maximum and minimum values 2.) To solve problems with linear programming. Linear programming got its name because it provides a plan or a program that uses linear equations and inequalities. Vocabulary.

chandler
Download Presentation

3.4 Linear Programming

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. 3.4 Linear Programming Objectives: 1.) To find maximum and minimum values 2.) To solve problems with linear programming

  2. Linear programming got its name because it provides a plan or a program that uses linear equations and inequalities. Vocabulary which means finding the maximum and minimum values of some quantity Many real-life problems involve a process called optimization,___________________________________________________________. In this lesson, we will study one type of optimization process called linearprogramming. A linear programming model consists of a system of linear inequalities called ___________ and an ___________________ that can be can be maximized or minimized. constraints objective quantity

  3. Procedure: To find the minimum or maximum value of the objective quantity: • Find all the vertices of the graph of the constraint inequalities. • Evaluate the objective quantity at each vertex. • The least of these is the minimum for the entire region; the greatest of these is the maximum for the region.

  4. Example 1Solving a Linear Programming Problem Find the minimum and maximum value of C = 4x + 5y Objective Quantity subject to the following constraints, x ≥ 0 y ≥ 0 Constraints x + y ≤ 6

  5. Solution: Step 1:Graph the system of inequalities: x ≥ 0 y ≥ 0 x + y ≤ 6 Step 2:Determine the coordinates of the three vertices of the graph: (__,__)(__,__)(__, __) (0,6) (6,0) (0,0) 0 6 6 0 0 0

  6. Solution: Step 3: Evaluate C = 4x + 5y at each of the three vertices of the graph. At (0,0): C = _______________ At (6,0): C = _______________ At (0,6): C = _______________ Step 4: Determine the maximum and minimum values. minimum 0 24 maximum 30

  7. Property Vertex Property of Linear Programming Ifthere is a maximum or a minimum value of a linear objective function, it ______________________________________________________________. occurs at one or more vertices of the feasible region.

  8. If the region is unbounded, but has a top on it, there will be a maximum only. If the region is unbounded, but has a bottom, there will be a minimum only. A note about: Unbounded Feasible Regions

  9. x0 y2x+2 5x+y Vertices? (0,2) C=0+5(2)=10 (1,4) C=1+5(4)=21 Maximum only! Max of 21 at (1,4) Ex: C=x+5y Find the max. & min. subject to the following constraints

  10. Check for Understanding Find the minimum value and maximum value of C = 3x + 4y Objective quantity Subject to the following constraints: x ≥ 2 x ≤ 5 Constraints y ≥ 1 y ≤ 6

  11. Final Checks for Understanding • Find the maximum and minimum values, if they exist, of c = 3x + 4y for each set of constraints. • 3 ≤ x ≤ 8 b. 2 ≤ x 2 ≤ y ≤ 6 4 ≤ y ≤ 8 2x + y ≥ 12 x + 2y ≥ 16 • Graph the feasible region for each set of constraints: x + 2y ≤ 8 2x + y ≥ 10 x ≥ 0 y ≥ 0 No max min = 34 max = 48 min = 23

  12. Real-Life Application: Manufacturing A ski manufacturer, which has a fabricating and a finishing department, makes two types of skis. A pair of downhill skis requires 6 hours to fabricate and 1 hour to finish. A pair of cross-country skis requires 4 hours to fabricate and 1 hour to finish. The fabricating department has 108 hours of labor available per day, while the finishing department has 24 hours of labor available per day. The company makes a profit of $40 on each pair of downhill skis and $30 profit on each pair of cross-country skis.

  13. Write the objective function. Write a system of linear inequalities to represent the constraints. Graph the feasible region. Find the maximum profit for the given constraints. Real-Life Application: Manufacturing

  14. Solution: Let x = downhill skis Let y = cross-country skis 6x + 4y ≤ 108 x + y ≤ 24 x ≥ 0 y ≥ 0 P(rofit) = 40x + 30 y; Maximum _________ $780