250 likes | 411 Views
Engr/Math/Phys 25. 3x00 XY-Stage Transit/Settling Time. Bruce Mayer, PE Dir. System Engineering 17Oct02. Effecting Planer Motion. An XY Stage. Executive Summary. Test Procedure Attach Accelerometer to 3xxx Stage Move Stage in Short, Medium, Long Runs
E N D
Engr/Math/Phys 25 3x00 XY-StageTransit/Settling Time Bruce Mayer, PEDir. System Engineering17Oct02
Effecting Planer Motion An XYStage
Executive Summary • Test Procedure • Attach Accelerometer to 3xxx Stage • Move Stage in Short, Medium, Long Runs • Record Accelerometer OutPut With Oscope • Estimated SETTLING TIME: <15ms • Olympus Stage Transit-Time Model • d Travel Distance in mm • Tt Transit Time in mS
Goals & Logistics • Goals → For 3xxx XY-Stage Determine • Typical AntiVibration-Table Settling Time • Model: Transit-Time vs. Transit-Distance • Logistics • Test Date = 15-Oct-2002 • Experimenters = B. Mayer, CEE • Test System = YYY-3xxx • Hi-Accuracy XY-Stage • Mechanical (i.e., spring-based) AntiVibration Table
Test Design • Attach Accelerometer to XY-Stage • Measure Accelerometer Output w/ Oscope • Program System for Die Jumps on 200mm wafer with KLARRF Map Die Patterns • X-Pitch = 7.8408280000e+03 µm (7.8408 mm) • Y-Pitch = 1.4138693000e+04 µm (14.1387 mm) • Die Jumps: L↔R, T↔B, UL↔LR, UR↔LL • Full Cross-Wafer (long) Moves • 4-Die Moves • Single-Die Moves
Omega ACC-102 Accelerometer(100 mV/g) AcceleroMeter Mounting Wafer & Chuck Major Axis = Z OTA-3xxxStage
Instrumentation Cables To/FromAcceleroMeter Omega ACC-PS1AcceleroMeterPower Supply Fluke-199 200 MHz ScopeMeter
Results & Analysis - Plots on Next Slides • AntiVibe Table Settling Time 15ms • Time Beyond Motor-Stop • S-Curve Accel & Decel Improves Settling Time • Transit-Time Model Determined by Linear-Regression: • d Travel Distance in mm • Tt Transit Time in mS • Full Speed = 1/[4.37 mS/mm] = 229 mm/S • Very-Short Move Time Const 47 mS
Results & Analysiscont.1 • Max Z-Acceleration = 5.92g • Y-Axis “Rattles” about 4-TIMES More than the X-Axis • Suggests inquiry into the source of the added Settling Time
~ConstantVelocity Ramp Up/Down
All Done for the COURSE See You in Fall 13
All Done for Today An XYStage
Engr/Math/Physics 25 Appendix Time For WhtBd Demo Time For Live Demo Bruce Mayer, PE Licensed Electrical & Mechanical EngineerBMayer@ChabotCollege.edu
Engr/Math/Physics 25 Settling TimeAPPENDIX Bruce Mayer, PEDir. System Engineering17Oct02
KLARFF Map Details FileVersion 1 1; FileTimestamp 08-22-02 13:33:54; InspectionStationID "NONE" "BITMAP" "ORB102"; SampleType WAFER; ResultTimestamp 08-22-02 10:14:55; LotID "QT96B2815340_3"; SampleSize 1 200; SetupID "T96B_UP" 05-08-02 07:02:28; StepID "RTP_ANNEAL_2"; SampleOrientationMarkType NOTCH; OrientationMarkLocation UP; DiePitch 7.8408280000e+03 1.4138693000e+04; DieOrigin 0.0000000000e+00 0.0000000000e+00; WaferID "01"; Slot 1; SampleCenterLocation 4.3974690000e+03 7.8404710000e+03;