AQMS Accreditation ProgramsLessons Learned Auditor Workshop Atlanta, GA July 22-23, 2010
Objectives • Provide an overview of the NCR’s identified from the witness audits. • Present in process approach. • Discuss what to expect when witnessing
Pre-Audit Assignment • PREVIOUS NCRS: • Assigning Auditors who either did not have the proper NACE code or AS91XX qualifications or potential conflicts (such as ITAR). • Client not made aware of the OP assessor. • AWARENESS: • Verify auditors are qualified for the full dynamics of the audit. • Communicate clearly with the client. • Applicable to both witness audits and office assessments
Pre-Audit Planning • PREVIOUS NCRS: 19011, 6.4.1.c • (4) The audit plan did not ID the organizations functional units and processes to be audited. • AWARENESS: • The audit plan ensure the client will have the proper resources available to the audit. • Clearly demonstrates what processes are intended to be audited. • Applicable to both witness audits and office assessments
Pre-Audit Planning • PREVIOUS NCRS: 17021. 9.3.2.1 • (2) Audit Planning not effective in assuring the AQMS is assessed to the min requirements for surveillance audits. • AWARENESS: • Ensure the auditors understand where the full auditing requirements are for surv audits if not clearly ID in the audit plan. • Applicable to both witness audits and office assessments
Pre-Audit Planning • PREVIOUS NCRS: MD 5 and AS9104 • (5) Insufficient Auditor Days in the planning without clear justification. • AWARENESS: • If deviation…..JUSTIFY. • If the audit is being witnessed, provide to ANAB in the pre-audit information. • Applicable to both witness audits and office assessments
On-site Audit Depth of auditing • PREVIOUS NCRS: • Sampling part of an element and making a conclusion on the whole requirement. • AWARENESS: • Audit plan and report accuracy is critical.
On-site Audit Depth of auditing • PREVIOUS NCRS: • Auditing to the scope of certification is not adequate. • AWARENESS: • Ensuring the scope of certification, scope of audit and audit plan is consistent. • Validate the exclusions. Is scope consistent with the QM? • Ensure the address and scope on the Certificate is correct.
On-site Audit Depth of auditing • PREVIOUS NCRS: • Not following audit trails when objective evidence suggest otherwise. • AWARENESS: • A plan is a plan. The CB should follow the trail to its natural conclusion if potential findings are evident. • The CB should keep head on a swivel, don’t ignore clear findings.
On-site Audit Depth of auditing • PREVIOUS NCRS: • Not fully verifying the effectiveness of the actions taken on nonconformities identified during the previous audit. • AWARENESS: • Ensure the evidence is more than a record review.
On-site Audit Understanding • PREVIOUS NCRS: • Not fully auditing Outsourcing when applicable. • AWARENESS • Standard clearly requires “control of such outsourced processes shall be identified” and therefore subject to audit. Not just a document verification.
On-site Audit Understanding • PREVIOUS NCRS: • Changes to the capability listing of the client. • AWARENESS • Similar to the scoping discussion. The CB should verify any changes to the capability listing as this could affect the scope of certification or introduce new processes and technology.
On-site Audit Decisions • PREVIOUS NCRS: • Calling the Clients CA/PA system effective with ineffective/inadequate correction, root cause or corrective action. • AWARENESS: • The CB should deep dive the CA/PA system. Validate the information. If it doesn’t make sense….the CB should document the NCR.
On-site Audit Decisions • PREVIOUS NCRS: • Soft Grading • Clearly stating findings during the audit and not raising the NCR or improper categorization. • Accepting informal correction during the audit. • LEARNINGS • The CB should learn the definitions and follow them. Keep track of the “verbal” findings identified during the audit. Accepting correction to verbal findings without reporting is consulting. • As an auditor it is not their job to justify an NCR down.
On-site Audit Decisions • PREVIOUS NCRS: • Continuing the audit when the audit objectives are clearly unattainable. • AWARENESS: • Only the client can make the decision to continue an audit. • There should be a clear conclusion that the objectives are unattainable and reported to the client with options. • At the time this is realized not at the end!!
On-Site Audit Closing • PREVIOUS NCRS: • Closing meeting does not address all of the requirements. • AWARENESS • The CB should clearly address the CA follow up and impacts on the existing cert. • The CB should ensure the CA are presented to the correct requirements.
On Site/Off-Site Audit Reporting • PREVIOUS NCRS: • Report not in conformance with AS9014/AS91XX • AWARENESS • The report should include: • Justification / explanation all NA. • Clear evidence to support the conclusion. • Clear evidence to support the SCOPE. • Detailed notes • Applicable to both witness audits and office assessments
Post Audit NCR Closure • PREVIOUS NCRS: Improper closing of NCR’s and Improper Certification Decision. • AWARENESS: • Clear evidence of Correction, RC and CA. • Ensure the NCR’s are closed with appropriate evidence PRIOR to the cert decision.
Office Assessments OASIS • PREVIOUS NCRS: OASIS data base admin /accuracy • AWARENESS: • Must have the CB log in to see OASIS information • Verify • Accuracy (reports, scoring, certificates) • Timing
Office Assessments Transfers • PREVIOUS NCRS: • Transfer requirements not met. • AWARENESS: • Specific requirements for pre-transfer review • Validating the certificate • Collecting audit records for last full system (initial or re-cert) and subsequent surveillances. • NCR’s should be closed (or closed by new CB before certification) • If pre-transfer review is unsuccessful full audit must be conducted.
Office Assessments Certification Decision Process • PREVIOUS NCRS: • Improper qualification /competency of AS cert decision maker. • AWARENESS: • Cert decision maker must include someone with aerospace knowledge • Must be independent of the audit being reviewed (including independent of the corrective action reviews)
Office Assessments Certification Decision Process • PREVIOUS NCRS: • Decision made with incomplete or inadequate certification information. • AWARENESS: • Records not available (report, CA’s, etc) • Records not complete or inaccurate
Office Assessments Certification Documents (e.g. Certificate) • PREVIOUS NCRS: • Certificates are incorrect or inaccurate. • AWARENESS: • Scope statements not correct or misleading (not specific enough) or incorrect for multiple sites. • Addresses incorrect or does not include all addresses for multiple sites. • Text in regards to being accredited under the registration management program. • Unaccredited certificates not allowed