An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. M&V Reporting Lia Webster, Nexant

  2. Current M&V Reporting - IDIQ Requirements (C.4.2): Post-Install M&V report • Contents to be specified in M&V plan • Report on: ECM installation, inspection, & commissioning • M&V reports • Annual is minimum frequency • Provide evidence that continued ECM performance achieves guaranteed cost savings • Contents: ECM performance measurements, Calculations, & Baseline adjustments

  3. M&V Reporting working group Subcommittee formed in Palm Springs (Ron Araujo, Sylvia Berry-Lewis, Doug Dahle,Dan Flaig, Mark Halverson, Quinn Hart, Scott Judson, Venkat Kumar, Mike Parker, Julie Payne, Dan Sanders, Tatiana Strajnic, Tory Sweetser, Dave Underwood, Phil Voss) Objective: • Develop a standard format for annual M&V reports Status: • Template under development: • Detailed outline • with mandatory and optional sections • Include current utility rates (optional)

  4. Key issues in M&V reporting: • M&V report should have enough context to make sense alone • Background information is critical : • DO (ECM descriptions, M&V plan, cost schedules), acceptance documentation, commissioning materials, post-installation report, contract modifications • Making M&V report all-inclusive = MASSIVE report

  5. Ideas • ESCOs could issue CD ROM and/or binder with all relevant background info • With first year M&V report only • Shouldn’t be too hard for ESCO to assemble • FEMP working on electronic filing system • documents would be available to Agency if needed; not currently in place • Note: Electronic documentation is NOT a current program requirement

  6. Another idea from working group… FEMP needs to address question: “why don’t we see savings in the utility bills?” • SuperESPC could address issue separate from M&V reports, or • Standard language could be included as appendix to M&V reports