1 / 8

ICCARUS 2019 – Offenbach, 18 – 22 March 2019

NMA scientific projects, implementation and testing of ICON/ICON-LAM. ICCARUS 2019 – Offenbach, 18 – 22 March 2019. NMA contribution to projects within the COSMO consortium WG6 Activities: Seasonal Score Production Newsletter Web updates COSMO Support activities

chelsear
Download Presentation

ICCARUS 2019 – Offenbach, 18 – 22 March 2019

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. NMA scientific projects, implementation and testing of ICON/ICON-LAM ICCARUS 2019 – Offenbach, 18 – 22 March 2019

  2. NMA contribution to projects within the COSMO consortium • WG6 Activities: • Seasonal Score Production • Newsletter • Web updates • COSMO Support activities • ICON Support activities • Support for implementation • FAQ contributions • Amalia and Bogdan will be @ the NWP Training (for the additional course on ICON installation) • WG4 Activities: • participation in PP AWARE • model failure cases • PP CARMA • PP C2I ICCARUS 2019 – Offenbach, 18 – 22 March 2019

  3. PP CARMA • PL: Amalia IRIZA-BURCA (NMA) • Task 1. First Level Support Implementation and Training • Start 12.2018 – End 06.2019 – ON-GOING • 1.1 Documentation review (MEC-Rfdbk), analysis of resources required. • Start 12.2018 – End 01.2019 – done • 1.2 Documentation preparation (MEC-Rfdbk) • Start 01.2019 – End 02.2019 – done • Some documentation has already been loaded to the WG5 Repository • NEXT (by the end of April) • 1.3 Preparation of a complete example set of data (one season, one model) to be used • Start 01.2019 – End 02.2019 –on-going • 1.4 Training provided by DWD experts for first level support to the PST • Start 03.2019 – End 03.2019 • - Slight delay due to scheduling conflicts, but details have been already discussed; will take place between 09-11 April 2019 ICCARUS WG5 meeting, 21 March 2019

  4. PP CARMA • Task 1. First Level Support Implementation and Training Start 12.2018 – End 06.2019 – ON-GOING • NEXT STEPS: • 1.5 Implementation of the MEC-Rfdbk system @NMA and @HNMS. • Start 03.2019 – End 05.2019 • 1.6 Adaptation of scripts for the production of the CP requirements • Start 05.2019 – End 06.2019 • 1.7 Setup of web interface with the use of Shiny R routines on COSMO server • Start 05.2019 – End 06.2019 • Contributors: • A. Iriza-Burca (NMA), F. Gofa (HNMS), B. Maco (NMA), F. Fundel (DWD), R. Potthast (DWD), E. Bauernschubert (DWD), D. Boucouvala (HNMS), T. Andreadis (HNMS) • Task 2. Second Level Implementation and support Start 05.2019 – End 10.2019 • Crucial issues (over the next few months) have been identified and will be tackled. ICCARUS WG5 meeting, 21 March 2019

  5. PP C2I • Implementation and Initial Testing of ICON-LAM in NMA • Compiling of ICON model and ICON_TOOLS (done) • Set-up of ICON-LAM for Romanian territory – initial testing (done) • ICON-LAM-7km: initial and LBC data from ICON global (same data used for operational COSMO-7km) • ICON-LAM-2.8km: initial and LBC data from ICON global (same data used for operational COSMO-7km) • ICON-LAM-2.8km: initial and LBC data from ICON-LAM-7km • Tests for slightly smaller domains than COSMO-7km and COSMO-2.8km operational • Running the ICON-LAM just for a few test cases ICCARUS 2019 – Offenbach, 18 – 22 March 2019

  6. PP C2I • Set-Up for Pre-Operational Activity of ICON-LAM in NMA • Set-up of ICON-LAM for Romanian territory at 7 km resolution on a similar (slightly larger) domain as the operational COSMO-7km • Initial and LBC data from ICON global (same as operational COSMO-7km), 00UTC run • Tried a few variants for integration domain (done) • Tests with different types of output files (done) • Running the ICON-LAM-7km for January 2019 (some severe weather situations) (done) • Comparing the results with COSMO-7km operational run (on-going) • Visualization (on-going) • Post-processing (will begin as soon as possible) • Verification (will begin as soon as possible) ICCARUS 2019 – Offenbach, 18 – 22 March 2019

  7. Observations COSMO-7km COSMO-2.8km Initial Testing of Implementation ICON-LAM-7km ICON-LAM-2.8km (from ICON global) ICON-LAM-2.8km (from ICON-LAM-7km) ICCARUS 2019 – Offenbach, 18 – 22 March 2019

  8. PP C2I • Set-Up for Pre-Operational Activity of ICON-LAM in NMA • due to limited computational resources, tests were only performed on our back-up machine until now • new HPC expected around summer At present, ICON-LAM-7km is implemented in NMA, first tests are performed and we are almost ready for pre-operationalization (parallel with COSMO-7km for assessment) – also depending on the computing resources available. ICCARUS 2019 – Offenbach, 18 – 22 March 2019