An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. CYRIC Hyperball2 infrastructure インフラ整備

  2. Preparations • Electric power supply • Cabling • FERA and Double buffer • Ge check by Takeshi Yamamoto • Beam line alignment by Takeshi Koike

  3. Power supply • 4 power lines (A,B,C,D). • Each line has 15 A current limit. • A and B, C and D are combined (30 A limit). • A : All NIM-BINs (11 A w/o 671 and signal) • B : CAMAC1, VME1 (9 A w/o signal) • C : CAMAC2, VME2 (9 A w/o signal) • D : All FANs, BGO HV, PC (9 A BGO off) • For Siball and BGO multi-filer, we will use another power line “E” which has 50 A limit.

  4. Cabling • TFA→CFD→TUL→FI/FO→TDC or trigger • All re-cabling and check connections • CFD decay cable • 20 ns or 18 ns cable delay + variable delay • CFD reset veto line • Trigger part (ADC gate and so on)

  5. FERA and double buffer • FERA system works well. • Signal timing and number of data are OK. • Expected dead time ~28 ms (average) • FERA data bus cable has some trouble… • 4~7 bit all “1” (under 8 bits are always “fX). • I lose 18 of 34 pin connecters… (´д`;) こんなチョンボがあるなんて~

  6. TO DO • FERA and double buffer • Analyzer • DAQ Module check (all channels) • Other preparations →M2, M1, M0 • Number of TFA is not enough. • 33 TFA (36 needed) are available because of noisy TFA.

  7. To be loaned from RIKEN • 671, TFA • Preamp power supply • NIM module and NIM-BIN • NIM-BIN for Siball and BGO filter

  8. Beam line alignment in the course 33 Sx Sy Q3 Q2 Q1 Concrete Shield

  9. Beam line alignment in the course 33 Sx Sy Q3 Q2 Q1 Concrete Shield

  10. Long run monitor test (at Seiko ) • 10/15~ • 10/25 C/H 61.3K, Ge 77.3K (Pre.Amp. OFF) • HBJ det. No.1 test • Det. No.1 delivery to Seiko ~10/31 • Resolution measurement at(10/26) ORTEC • Performance test with LN2 • Chamber production (Fuji elec.) • Assembly and pumping @ Seiko (2~3 days) • Start of cooling and test run • Cooling profile • Resolution measurements • Canberra dummy cooling test • Connection design in progress?