An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. FY 2015/16 – 2029/30 Prioritized Project List METROPLAN ORLANDO Board September 8, 2010

  2. FY 2015/16 - 2029/30 Prioritized Project List • Includes highway, bicycle & pedestrian, & transit projects with unfunded phases in Five Year Work Program/TIP • To be used in developing FY 2011/12-2015/16 Five Year Work Program • Five Year Work Program will be used in developing FY 2011/12-2015/16 TIP

  3. FY 2015/16 Funding Allocation Estimates (Based on average annual allocations for FY 2010/11-2014/15) Surface Transportation Program (SU) funds = $21.0 million $4.5 million set aside for M&O & Road Rangers = $16.5 million balance • 55%53% of $16.5 million for Highway Improvements = $8.7 million • 33%35% of $16.5 million for Transit Improvements = $5.8 million • 12% of $16.5 million for Bike & Ped Improvements = $2.0 million District Dedicated Revenue (DDR) funds = $55.1 million National Highway System funds = $42.0 million Rental Car Surcharge funds = $14.0 million

  4. Highway Projects RankingCriteria • Ratio of traffic volume to carrying capacity • Status of right-of-way acquisition • Functional classification of roadway

  5. Highway Project Categories • National Highway System-improvements to I-4 • Surface Transportation Program- improvements to major state road arterials • Management & Operations- improvements such as computerized signals, modifying intersections, etc.

  6. FY 2015/16 – 2029/30 Prioritized Project List National Highway SystemProjects (no changes)

  7. #1I-4/SR 46 Interchange Improvement Unfunded phases:Construction #2 I-4 Ultimate Configuration- S of Beachline Expy. to SW of Kirkman Rd. - Unfunded phases:Design/ROW/ Construction #2 (cont’d) I-4 Ultimate Configuration- SW of Kirkman Rd. to W of US 441 - Unfunded phases:Remaining ROW/ Construction #2 (cont’d) I-4/Kirkman Rd. Interchange Improvement Unfunded phases:ROW/Construction

  8. #2 (cont’d) I-4 Ultimate Configuration- W of US 441to S of Ivanhoe Blvd. - Unfunded phases:Remaining Construction #2 (cont’d) I-4 Ultimate Configuration - S of Ivanhoe Blvd. to N of Kennedy Blvd. - Unfunded phases:Remaining ROW/ Construction #2 (cont’d) I-4 Ultimate Configuration- N of Kennedy Blvd. to Orange/Seminole Co. Line - Unfunded phases:Remaining ROW/Construction #3 I-4 Ultimate Configuration- Orange/Seminole Co. Line to N of SR 434 - Unfunded phases:Remaining ROW/ Construction

  9. #3 (cont’d) I-4 Ultimate Configuration- N of SR 434 to Seminole/Volusia Co. Line - Unfunded phases:Design/ ROW/ Construction #4 I-4 Ultimate Configuration - Orange/Osceola Co. Line to W of Beachline Expy. - Unfunded phases:Design/ ROW/Construction #5 I-4 Ultimate Configuration- S of Polk/Osceola Co. Line to Orange/Osceola Co. Line - Unfunded phases:Design/ ROW/Construction

  10. FY 2015/16 – 2029/30 Prioritized Project List Surface Transportation Program Projects

  11. #1 US 17/92/SR 436 Flyover Unfunded phases:Remaining ROW/Construction(was #2) #2 Sand Lake Rd.- Turkey Lake Rd. to Presidents Dr. - 6 Lane & John Young Pkwy. Flyover Unfunded phases:Remaining ROW/Construction (was #4) #3SR 15- Lee Vista Blvd. to Conway Rd. - 4 Lane Unfunded phases:Remaining ROW/Construction (was #5) #4SR 46- Mellonville Ave. to SR 415 - 4 Lane Unfunded phases:Construction (was #6)

  12. #5 John Young Pkwy. Extension- Shader Rd. to Edgewater Dr. New 6-Lane Roadway - Unfunded phases:Construction (was #7) #6Forest City Rd.- Edgewater Dr. to Maitland Blvd. - 6 Lane Unfunded phases:Design/ROW/Construction (was #8) #6John Young Pkwy.- SR 50 to Shader Rd. - 6 Lane Unfunded phases:Design/ROW/Construction (was #8) #7 US 17/92- Poinciana Blvd. to Ham Brown Rd. - 4 Lane Unfunded phases:Construction (was #9)

  13. #8SR 434- I-4 to Rangeline Rd. - 6 Lane Funded through construction with Seminole County local & TRIP funds. Remains on list in case additional Federal/ State funds become available. (was #10) #8 (cont’d)SR 434- Rangeline Rd. to CR 427 - 6 Lane Unfunded phases:Design/ROW/Construction (was #10) #9 SR 436/Red Bug Lake Rd. Flyover Funded through construction with Seminole County local funds & TRIP funds. Remains on list in case additional Federal/State funds become available. (was #11)

  14. #10 US 192- Aeronautical Blvd. to Budinger/Columbia Ave. - 6 Lane - Unfunded phases:Construction (was #12) #10 (cont’d) US 192- Eastern Ave. to CR 532/Nova Rd. - 6 Lane - Unfunded phases:Construction (was #12) #11 Hoagland Blvd - US 17/92 to 5th St. - 4 Lane/Realignment Unfunded phases:ROW/Construction (was #13) #12 Silver Star Rd.- Dillard St. to Western Expy. - 4 Lane Unfunded phases:Design/ROW/Construction (was #14)

  15. #13 SR 415- SR 46 to Seminole/Volusia Co. Line - 4 Lane Unfunded phases:ROW/Construction (was #15) #14 Maitland Blvd.- Maitland Concourse Pkwy. to Maitland Ave. - 6 Lane - Unfunded phases:PD&E/Design/ Construction (was #16) #15 SR 426- Pine Ave. to Lockwood Blvd. - 4 Lane (TRIP) Unfunded phases:ROW/Construction (was #17) #16 SR 50- E Old Cheney Hwy. to SR 520 - 6 Lane Unfunded phases:Design/ROW/Construction (was #18)

  16. #17 US 17/92 - Norfolk Ave. to Monroe St. - Improve Median & Intersections/Extend Lee Rd. from US 17/92 to Denning Dr. Unfunded phases:Design/ROW/Construction (was #19) #18SR 46- SR 415 to CR 426 - 4 Lane Unfunded phases:Design/ROW/Construction (was #20) #18SR 46- CR 426 to Seminole/Volusia Co. Line - 4 Lane Unfunded phases:PD&E/Design/ROW/Construction (was #20) #19John Young Pkwy.- Pleasant Hill Rd. to Portage St. - 6 Lane Unfunded phases:Design/ROW/Construction (was #21)

  17. FY 2015/16 – 2029/30 Prioritized Project List Management & OperationsProjects (Prioritized)

  18. No Priority #(TRIP) Traffic Signal Coordination - Retiming of traffic signals region-wide - Unfunded phase: Implement retiming #1 Silver Star Rd. - Lakeview Rd. to Clarke Rd. - CMS Improvements - Unfunded phases: ROW/Construction #2 John Young Pkwy.- Portage St. to US 192 - Modify Median to 6 Lanes - Unfunded phases: Construction #3 Osceola Co. Traffic Control Center - Regional Control Center Improvements - Design/ConstructionFully funded

  19. #3 Install & Expand Seminole Co. ATMS Phase 2 Unfunded phases: Design/Construction (was #4) #4 Install & Expand Orange Co. ATMS Project 1Unfunded phases: Design/Construction (was #5) #5 Improve US 17/92/Pleasant Hill Rd. Intersection Unfunded phases:Design/Construction(was #6) #6Expand/UpgradeOrlando Regional Computerized Signal SystemSub-phase 1 Unfunded phases: Design/Construction (was #7) #7Expand Osceola Co. ATMS Year 4 Unfunded phases: Design/Construction (was #8)

  20. Management & OperationsProjects (Non-Prioritized) • Orange Ave. - Gatlin Ave. to Holden Ave. - Intersection • Enhancement -Unfunded phases: Construction • Robinson St. - Hughey Ave. to Garland Ave. • Improve Capacity -Unfunded phase: ROW/Construction • International Dr. - Oak Ridge Rd. to Sand Lake Rd. • CMS Improvements - Unfunded phases: Construction

  21. Install & Expand Orange Co. ATMS Projects 2-6 Unfunded phases: Design/Construction • Expand/UpgradeOrlando Regional Computerized Signal SystemSub-phases 2-7 -Unfunded phases: Design/ Construction • Expand Osceola Co. ATMS Year 5 Unfunded phases: Design/Construction

  22. FY 2015/16 – 2029/30 Prioritized Project List Bicycle & Pedestrian Projects

  23. Bicycle & Pedestrian Projects Ranking Criteria • Expected facility usage • Direct connection to transit • Inclusion in local government bicycle and pedestrian plans • Linkage with other bicycle and pedestrian facilities

  24. #1Riverwalk Phase II - French Ave. to Zoo Entrance Unfunded phases: Design/Construction #2Shingle Creek Trail Ph. 2-5 - Conroy Rd. to Sand Lake Rd. & US 192 to Osceola Pkwy. Unfunded phases: Design/Construction (was #3) #3Cady Way Trail Extension - Magnolia Ave. to Gurtler St. Unfunded phases: Construction (was #5) #4 Oviedo Town Gateway Sidewalk - Mitchell Hammock Rd. to Lindsay Ln.-Unfunded phases: Design/Construction (was #6)

  25. #5Orlando Southeast Trail - Medical City AreaUnfunded phases: Design/Construction (was #10)#6Lake Jessup Ave. Sidewalks - Mitchell Hammock Rd. to Artesia St. - Unfunded phases: Design/Construction(was #11) #7 Orlando Primary Bike Route Plan -Unfunded phases: Construction(was #12) #8 Toho-Valencia Path from Oak St. to Valencia CC Unfunded phases: Design/Construction (was #14)

  26. #9 Orange Blossom Tr. from Gore St. to Church St. - Upgrade Sidewalks - Unfunded phases: Design/Construction(was #16) #10Central Ave. from MLK Blvd. to Donegan Ave. - Bike & Ped Improvements - Unfunded phases: Design/ Construction (was #17) #11St. Andrews Trail from Cady Way Trail to Aloma Ave. Unfunded phases: Design/Construction (was #18) #12West Orange Trail Phase 4 - Rock Springs Rd. to Kelly Park Rd. - Unfunded phases: Design/Construction (was #19)

  27. #13 Pine Ave. Sidewalks in Oviedo - Unfunded phases: Design/Construction(was #20)#14 LYNX System-wide Bicycle Parking- Unfunded phases: Design/Construction(new project) #15 Maitland & Eatonville Bicycle Wayfinding- Unfunded phases: Design/Construction(new project) #16 Orlando Main Street District Plans- Unfunded phases: Design/Construction(new project)

  28. #17 Downtown Kissimmee Streetscape- Unfunded phases: Design/Construction(new project) #18 Edgewater Drive Streetscape -Unfunded phases: Design/Construction(new project) #19 OBT Pedestrian Enhancements Ph. 2 - Unfunded phases: Design/Construction(new project) No Priority #I-4 Pedestrian Bridge over Lake IvanhoeUnfunded phase: Construction

  29. Proposed Funding Cap Policy for Bike & Ped Projects Adopted by BPAC – July 2010: Any new or future bike & ped project costing over $4 million must be divided into phases, with a cost of not more than $4 million per phase.

  30. FY 2015/16 – 2029/30 Prioritized Project List Major Transit Projects

  31. Transit Projects Ranking Criteria • Basic services and programs • Service development projects • Capital for bus replacement/repair/maintenance • Customer amenities • Capital for non-basic service • Systems development (ITS, other technologies) • Studies (DEIS, etc.)

  32. Proposed Change to SU TransitFunding Policy METROPLAN ORLANDO’s current policy for SU transit funds - must be used for new buses and/or bus shelters. Plans & Programs Subcommittee is recommending including general capital expenditures along with new buses and/or bus shelters.

  33. Operating Assistance • SunRail • Purchase 56 buses & 40 commuter vans • Purchase buses for service expansion resulting from Comprehensive Operational Analysis • Purchase SunRail support buses • Downtown Orlando Bus Rapid Transit system expansion

  34. Transit Centers/Super Stops • Kissimmee Intermodal Center • ITS Enhanced Circulator/FlexBus • Engineering/Construction • Innovation Way/Lake Nona/Medical City Corridor LRT - • Engineering/initial construction • Orange Blossom Express - Commuter Rail from • Downtown Orlando to Lake County - Alternative Analysis • (new project)

  35. Alternative Analysis Studies for I-4, SR 50, US 441 & • US 192 Corridors • International Drive Area Transit Corridor System Study • International Drive Area Intermodal Station • LRT from Beachline Expy. to Central Pkwy. - Construction • Fourth Operating and Maintenance Base

  36. FY 2015/16-2019/30 Prioritized Project List • Recommended for approval by: • CAC – 8/25/10 • BPAC – 8/25/10 • TTC – 8/27/10 • MAC – 9/2/10