320 likes | 464 Views
János Pogány, pharmacist, Ph.D. Geneva, 03 May 2004 E-mail: pogany@axelero.hu. PREQUALIFICATION OF ANTIMALARIA L DRUG PRODUCTS. Assessment of product dossiers – Quality part. SUBJECTS FOR DISCUSSION. Expression of Interest for Antimalarial Drugs
E N D
János Pogány, pharmacist, Ph.D. Geneva, 03 May 2004 E-mail: pogany@axelero.hu PREQUALIFICATION OF ANTIMALARIAL DRUG PRODUCTS Assessment of product dossiers – Quality part Dr. Pogány - Geneva
SUBJECTS FOR DISCUSSION • Expression of Interest for Antimalarial Drugs • Prequalification Requirements for Quality of Active Pharmaceutical Ingredients (APIs) and Finished Pharmaceutical Products (FPPs) • Quality Issues • Global issues • APIs • FPPs • Major Conclusions Dr. Pogány - Geneva
EXPRESSION OF INTEREST ANTIMALARIAL FPPs
EXPRESSION OF INTEREST(cont.) • Dihydroartemisinin (tablets, capsules, paediatric granules, suppositories) • Artemether (oral FPPs) • Artemether (intramuscular FPPs) • Artemether + Lumefantrine (oral FPPs) • Artemotil (injectable FPPs) Dr. Pogány - Geneva
(cont.) EXPRESSION OF INTEREST • Artesunate (oral FPPs) • Artesunate + Mefloquine (oral FPPs) • Artesunate + Amodiaquine (oral FPPs) • Artesunate + Sulphadoxine/Pyrimethamine (oral FPPs) Dr. Pogány - Geneva
HISTORY and CURRENT STATUS • First EOI published on 8 May 2002 • Assessment of dossiers started on July 2002 • FPPs (37 applications - 2approvalsas at 31 March 2004) • WHO-GMP inspection of the manufacturing sites of the applicants Dr. Pogány - Geneva
PREQUALIFICATION QUALITY REQUIREMENTS ANTIMALARIAL DRUGS
PREQUALIFICATION REQUIREMENTS • http://www.who.int/medicines/library/qsm/manual-on-marketing/who-dmp-rgs-985.doc • http://www.who.int/medicines/organization/qsm/activities/qualityassurance/gmp/gmpcover.html • WHO/HTP/EDM/QSM/2001: Standard Operating Procedure: Assessing Product Files • International Conference on Harmonization (ICH) guidelines Dr. Pogány - Geneva
PREQUALIFICATION REQUIREMENTS • If the product has been locally developed and manufactured, the NDRA must evaluate the data set itself (p. 23). • If an evaluation report—critical summary and interpretation of the data, with conclusions—is not available it is not possible to seek a WHO-type certificate (p. 23). Dr. Pogány - Geneva
PREQUALIFICATION REQUIREMENTS • Summary of Product Characteristics (SmPC) • Package insert • Labels • Preferably approved by the NDRA Dr. Pogány - Geneva
GLOBAL REGULATORY ISSUES ARTEMISIN DERIVATIVES
GLOBAL REGULATORY ISSUES (cont.) API OR FPP ORIGINATE „LEGALLY” FROM COUNTRIES WHERE: • Manufacture of APIsisnot regulated • Pharmaceutical exports and importsare not regulated Dr. Pogány - Geneva
(cont.) GLOBAL REGULATORY ISSUES • Marketing Authorization (MA) of FPPs is issued without evaluation by the National Drug Regulatory Authority (NDRA) • Biostudies are not requiredfor MA • National Good Manufacturing Practices (GMP) do not comply with WHO-GMP requirements Dr. Pogány - Geneva
ARTEMISIN-DERIVATIVE ISSUES • NO INNOVATOR FPP IS REGISTERED IN THE ICH REGION. NO COMPARATOR IS AVAILABLE FOR: • PHARMACEUTICAL EQUIVALENCE STUDIES • BIOEQUIVALENCE STUDIES • THE APIs and FPPs ARE NOT OFFICIALIN THE INTERNATIONALLY USED MAJOR PHARMACOPOEIAS • WHO GUIDES/SOPs APPLY TO MULTISOURCE FPPs. ICH GUIDESSHOULD BE USED. Dr. Pogány - Geneva
ILLUSTRATIVE APIQUALITY ISSUES EXAMPLE OF ARTESUNATE
ARTEMISININ - ARTESUNATE Artemisinin Artesunate Dr. Pogány - Geneva
SYNTHESIS DEFICIENCIES • Potential synthesis by-products,solvents and representative batch scale were not provided. • The final purification, crystallization and subsequent operations were not described in details. • Existence/absence of polymorphs, particle size, bulk and tapped density and hygroscopicity are not submitted. Dr. Pogány - Geneva
SPECIFICATIONS OF API AND FPP MANUFACTURERS (1) • The melting point is 143-145oC (p.4) as opposed to 131-134oC ± 1.5oC in the DMF. • Individual impurity limits were not based on batch analysis results and they were not in line with the ICH guidelines (e.g., NMT 1.0% instead of NMT 0.1%). • Residual solventswere included in the monograph but not in the DMF. Dr. Pogány - Geneva
SPECIFICATIONS OF API AND FPP MANUFACTURERS (2) • Noadequate information was provided on the preparation and quality specification of primary (absolute) and secondary (working) standards. (For instance, lack of complete CoA, assay by two different validated methods, detailed information on storage, etc.). • HPLC method is described as an alternative assay to titration but acceptance limits are 97-103% as opposed to 98-102% in the DMF. Dr. Pogány - Geneva
INTERNATIONAL PHARMACOPOEIA • ARTEMETHER • ARTEMISININ • ARTEMOTIL • ARTENIMOL • ARTESUNATE • MEFLOQUINE HYDROCHLORIDE • PROGUANIL HYDROCHLORIDE Dr. Pogány - Geneva
STABILITY • Stress stability (forced degradation) tests were not submitted to identifyexistence or absence degradants and to substantiate specificity of the impurity test method. • “Room temperature and accelerated tests are in progress.” Results were not submitted. Dr. Pogány - Geneva
CORRESPONDENCE WITH MANUFACTURERS • Substantial degradation was observed at high temperature and under intensive light. • Class2 solvents: pyridine and chloroform are used in the synthesis. • Impurities: “Further efforts are made to improve the process.” • The currently available stabilty data reveal possible decomposition and justify only a one (1) year re-test date. Dr. Pogány - Geneva
ILLUSTRATIVE FPPQUALITY ISSUES EXAMPLE OF ARTESUNATE TABLETS
REGULATORY ISSUES • Marketing authorization in the country of manufactureisnot issued. • Marketing authorization in the country of manufacture and Certificate of Pharmaceutical Product (CPP) is issued by the NDRA without assessment of the FPP quality. Dr. Pogány - Geneva
DEVELOPMENT PHARMACEUTICS • A report was not submitted to identify and describe the formulation and process attributes that can influence batch reproducibility, product performance and FPP quality, including stability. • A tabulated summary of the compositions of the FPP used in clinical trials or stability studies and a presentation of dissolution profiles was not provided.Dissolution time was not studied at all. Dr. Pogány - Geneva
CONCURRENT VALIDATION • The progress from pre-formulation → formulation → pilot manufacture → production scale manufacture was not shown in the submission. • There wasno validation report on the first three (3) full scale batches to establish the nature and specifications of subsequent in-process and final tests as well as provide assurance that the manufacturing process met expected results. Dr. Pogány - Geneva
STABILITY and SmPC • Degradants, dissolution rate and profile, water content, hardness, microbiological attributes, etc. were not tested or quantified. • A NDRA-approved Summary of Product Characteristics (SmPC) type information for health professionals was not submitted. Dr. Pogány - Geneva
CORRESPONDENCE WITH MANUFACTURERS • The stress data show that the blister pack does not protect the tablets even if overwrapped by additional protective packing.Supplier reduced expiry date. • Analysis of the tests for microbiological purity on „two (2) batches showed contamination with an invading yeast.” Dr. Pogány - Geneva
RETROSPECTIVE VALIDATION Annual quality review data and analysis were not submitted to prove that the manufacturing processes —including equipment, buildings, personnel and materials— are capable of achieving the intended results on a consistent and continuous basis. Dr. Pogány - Geneva
MAJOR CONCLUSIONS (cont.) • Initially, artemisinin-derivedFPPsdid not meet basic standards of quality • It takes time to get into compliance • Develop new formulation • Data to be generated, tests carried out • GMP upgrade needed • One FPP is prequalified from a DC; another is registered in the ICH region. Dr. Pogány - Geneva