CERN Data Centre Evolution. Gavin McCance gavin.mccance@cern.ch @ gmccance SDCD12: Supporting Science with Cloud Computing Bern 19 th November 2012. What is CERN ?. Conseil E urop éen pour la R echerche N ucléaire – aka European Laboratory for Particle Physics
E N D
CERN Data Centre Evolution Gavin McCance gavin.mccance@cern.ch @gmccance SDCD12: Supporting Science with Cloud Computing Bern 19th November 2012
What is CERN ? • ConseilEuropéen pour la RechercheNucléaire – aka European Laboratory for Particle Physics • Between Geneva and the Jura mountains, straddling the Swiss-French border • Founded in 1954 with an international treaty • Our business is fundamental physics , what is the universe made of and how does it work Gavin McCance, CERN
Answeringfundamental questions… • How to explainparticles have mass? We have theories and accumulatingexperimentalevidence.. Getting close… • Whatis 96% of the universe made of ? Wecanonlysee 4% of itsestimated mass! • Whyisn’tthere anti-matterin the universe? Nature shouldbesymmetric… • Whatwas the state of matterjustafter the « Big Bang » ? Travelling back to the earliest instants of the universewould help… Gavin McCance, CERN
The Large Hadron Collider (LHC) tunnel Gavin McCance, CERN
Data Centre by Numbers • Hardware installation & retirement • ~7,000 hardware movements/year; ~1,800 disk failures/year Gavin McCance, CERN
Current infrastructure • Around 12k servers • Dedicated compute, dedicated disk server, dedicated service nodes • Majority Scientific Linux (RHEL5/6 clone) • Mostly running on real hardware • Last couple of years, we’ve consolidated some of the service nodes onto Microsoft HyperV • Various other virtualisation projects around • In 2002 we developed our own management toolset • Quattor / CDB configuration tool • Lemon computer monitoring • Open source, but a small community Gavin McCance, CERN
Many diverse applications (”clusters”) • Managed by different teams (CERN IT + experiment groups) Gavin McCance, CERN
New data centre to expand capacity • Data centre in Geneva at the limit of electrical capacity at 3.5MW • New centre chosen in Budapest, Hungary • Additional 2.7MW of usable power • Hands off facility • Deploying from 2013 with 200Gbit/s network to CERN Gavin McCance, CERN
Time to change strategy • Rationale • Need to manage twice the servers as today • No increase in staff numbers • Tools becoming increasingly brittle and will not scale as-is • Approach • CERN is no longer a special case for compute • Adopt an open source tool chain model • Our engineers rapidly iterate • Evaluate solutions in the problem domain • Identify functional gaps and challenge old assumptions • Select first choice but be prepared to change in future • Contribute new function back to the community Gavin McCance, CERN
Building Blocks Bamboo mcollective, yum Puppet AIMS/PXE Foreman JIRA OpenStack Nova git Koji, Mock Yum repo Pulp Active Directory / LDAP Lemon / Hadoop Hardware database Puppet-DB Gavin McCance, CERN
Choose Puppet for Configuration • The tool space has exploded in last few years • In configuration management and operations • Puppet and Chef are the clear leaders for ‘core tools’ • Many large enterprises now use Puppet • Its declarative approach fits what we’re used to at CERN • Large installations: friendly, wide-based community • You can buy books on it • You can employ people who know it better than do Gavin McCance, CERN
Puppet Experience • Excellent: basic puppet is easy to setupand can be scaled-up well • Well documented, configuring services with it is easy • Handle our cluster diversity and dynamic clouds well • Lots of resource (“modules”) online, though of varying quality • Large, responsive community to help • Lots of nice tooling for free • Configuration version control and branching: integrates well with git • Dashboard: we use the Foreman dashboard • We’re moving all our production service over in 2013 Gavin McCance, CERN
Preparing the move to cloud • Improve operational efficiency and dynamicness • Dynamic multiple operating system demand • Dynamic temporary load spikes for special activities • Hardware interventions with long running programs (live migration) • Improve resource efficiency • Exploit idle resources, especially waiting for disk and tape I/O • Highly variable load such as interactive or build machines • Enable cloud architectures • Gradual migration from traditional batch + disk to cloud interfaces and workflows • Improve responsiveness • Self-Service with coffee break response time Gavin McCance, CERN
What is OpenStack ? • OpenStack is a cloud operating system that controls large pools of compute, storage, and networking resources throughout a datacenter, all managed through a dashboard that gives administrators control while empowering their users to provision resources through a web interface Gavin McCance, CERN
Service Model • Pets are given names like pussinboots.cern.ch • They are unique, lovingly hand raised and cared for • When they get ill, you nurse them back to health • Cattle are given numbers like vm0042.cern.ch • They are almost identical to other cattle • When they get ill, you get another one • Future application architectures should use Cattle but Pets with strong configuration management are viable and still needed Gavin McCance, CERN
HORIZON KEYSTONE Basic Openstack Components • Each component has an API and is pluggable • Other non-core projects interact with these components GLANCE NOVA Scheduler Compute Registry Image Volume Network Gavin McCance, CERN
Supporting the Pets with OpenStack • Network • Interfacing with legacy site DNS and IP management • Ensuring Kerberos identity before VM start • Puppet • Ease use of configuration management tools with our users • Exploit mcollective for orchestration/delegation • External Block Storage • Currently using nova-volume with Gluster backing store • Live migration to maximise availability • KVM live migration using Gluster • KVM and Hyper-V block migration Gavin McCance, CERN
Current Status of OpenStack at CERN • Working on an Essex code base from the EPEL repository • Excellent experience with the Fedora cloud-sig team • Cloud-init for contextualisation, oz for images with RHEL/Fedora • Components • Current focus is on Nova with KVM and Hyper-V • Keystone running with Active Directory and Glance for Linux and Windows images • Pre-production facility with around 200 Hypervisors, with 2000 VMs integrated with CERN infrastructure • used for simulation of magnet placement using LHC@Home and batch physics programs Gavin McCance, CERN
Next Steps • Deploy into production at the start of 2013 with Folsom running production services and compute on top of OpenStack IaaS • Support multi-site operations with 2nd data centre in Hungary • Exploit new functionality • Ceilometer for metering • Bare metal for non-virtualised use cases such as high I/O servers • X.509 user certificate authentication • Load balancing as a service Ramping to 15K hypervisors with 100K VMs by 2015 Gavin McCance, CERN
Conclusions • CERN computer centre is expanding • We’re in the process of refurbishing the tools we use to manage the centre based on Openstackfor IaaS and Puppet for configuration management • Production at CERN in next few months on Folsom • Gradual migration of all our services • Community is key to shared success • CERN contributes and benefits Gavin McCance, CERN
BACKUP SLIDES Gavin McCance, CERN
Training and Support • Buy the book rather than guru mentoring • Follow the mailing lists to learn • Newcomers are rapidly productive (and often know more than us) • Community and Enterprise support means we’re not on our own Gavin McCance, CERN
Staff Motivation • Skills valuable outside of CERN when an engineer’s contracts end Gavin McCance, CERN
When communities combine… • OpenStack’s many components and options make configuration complex out of the box • Puppet forge module from PuppetLabs does our configuration • The Foreman adds OpenStack provisioning for user kiosk to a configured machine in 15 minutes Gavin McCance, CERN
Foreman to manage Puppetized VM Gavin McCance, CERN
Active Directory Integration • CERN’s Active Directory • Unified identity management across the site • 44,000 users • 29,000 groups • 200 arrivals/departures per month • Full integration with Active Directory via LDAP • Uses the OpenLDAP backend with some particular configuration settings • Aim for minimal changes to Active Directory • 7 patches submitted around hard coded values and additional filtering • Now in use in our pre-production instance • Map project roles (admins, members) to groups • Documentation in the OpenStack wiki Gavin McCance, CERN
What are we missing (or haven’t found yet) ? • Best practice for • Monitoring and KPIs as part of core functionality • Guest disaster recovery • Migration between versions of OpenStack • Roles within multi-user projects • VM owner allowed to manage their own resources (start/stop/delete) • Project admins allowed to manage all resources • Other members should not have high rights over other members VMs • Global quota management for non-elastic private cloud • Manage resource prioritisation and allocation centrally • Capacity management / utilisation for planning Gavin McCance, CERN
Opportunistic Clouds in online experiment farms • The CERN experiments have farms of 1000s of Linux servers close to the detectors to filter the 1PByte/s down to 6GByte/s to be recorded to tape • When the accelerator is not running, these machines are currently idle • Accelerator has regular maintenance slots of several days • Long Shutdown due from March 2013-November 2014 • One of the experiments are deploying OpenStack on their farm • Simulation (low I/O, high CPU) • Analysis (high I/O, high CPU, high network) Gavin McCance, CERN
New architecture data flows Gavin McCance, CERN