1 / 22

Waste Water Treatment in Scotland

Waste Water Treatment in Scotland. Dalmarnock. Dalmarnock. Opened in 1894 Processed sewage dried and pressed Initially the processed sewage was sold as Globe fertiliser Laterally a pipeline was built connecting Dalmarnock to Shieldhall. Dalmuir. Dalmuir. Opened in 1904

chick
Download Presentation

Waste Water Treatment in Scotland

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Waste Water Treatment in Scotland

  2. Dalmarnock

  3. Dalmarnock • Opened in 1894 • Processed sewage dried and pressed • Initially the processed sewage was sold as Globe fertiliser • Laterally a pipeline was built connecting Dalmarnock to Shieldhall.

  4. Dalmuir

  5. Dalmuir • Opened in 1904 • Sewage also dried and pressed • Dumped at Sea off the tip of the Isle of Bute • Site downstream allowed easier access for sewage ships

  6. Shieldhall

  7. Shieldhall • Opened in 1910 • Also followed model at Dalmarnock • Built as the main sewage works for Glasgow • Rebuilt in 1980 to process sewage from surrounding areas

  8. Shieldhall

  9. Shieldhall Constant Velocity Grit ChannelsThe whole of the presedimentation or inlet works is fully enclosed and incorporates 6 large automatically raked mechanical screens followed by constant velocity grit channels which are cleaned by a travelling suction dredger. Maximum flows through this section of the plant can be 6 DWF.

  10. Shieldhall

  11. Shieldhall Primary Sedimentation TanksA total of 12 rectangular primary sedimentation tanks are installed, each of which has a travelling mechanical scraper mechanism. The capacity of these tanks provides a 6 hour retention at the DWF of 2.53m^3/sec.

  12. Shieldhall

  13. Shieldhall Mammoth rotor Aeration TanksSecondary treatment of sewage flows is provided in an activated sludge plant in the form of 6 rectangular aeration tanks which provide 5.5 hours retention at the design DWF.A total of 24 Biwater horizontal Mammoth rotors are installed in the aeration tanks to provide the required oxygen transfer and mixing necessary for the efficient operation of the process.

  14. Daldowie

  15. Daldowie • In 2000, at a cost of £65million, Scottish Water had built a plant at Daldowie, near Glasgow, to process half of Scotland's sewage into fuel pellets. These are used as a coal substitute by the giant Longannet power station in Fife to produce enough "carbon-neutral" electricity to power 30,000 homes.