HEAT TRACING SPECIALIST

HEAT TRACING SPECIALIST. WHO IS BDP?. ABOUT BDP. Calgary Based Integrated EPC Company specialized in heat tracing Holds APEGGA Permit to Practice Offices In Calgary & Edmonton 25 Full Time Employees & 5 Engineering Consultants on “As Needed” Basis Developed Internal Quality Program.

childersc
Download Presentation

HEAT TRACING SPECIALIST

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. HEAT TRACING SPECIALIST WHO IS BDP?

  2. ABOUT BDP • Calgary Based Integrated EPC Company specialized in heat tracing • Holds APEGGA Permit to Practice • Offices In Calgary & Edmonton • 25 Full Time Employees & 5 Engineering Consultants on “As Needed” Basis • Developed Internal Quality Program

  3. ABOUT BDP – continued • Safety is a core value at BDP • Good references with Alberta clients • Designed steam tracing facilities on all Petro-Canada projects in Alberta since 2002 as subcontractor to large EPC firms Key People: • Tony Miletic – 25 years of experience in piping design, last 15 years in steam tracing • Drago Crnogorac – over 25 years in project management

  4. ABOUT BDP – continued Construction Capabilities • BDP Industrial – BDP’s construction group engaged for work at modularization shop or at site with non-union or CLAC labor • Subcontract NewFab Industries at mod shop or at site where union labor is required

  5. HEAT TRACING SPECIALIST WHY BDP?

  6. WHAT ARE ADVANTAGES AND VALUE-ADD OF USING A SPECIALIZED INTEGRATED EPC COMPANY TO EXECUTE HEAT TRACING PORTION OF THE PROJECT?

  7. HEAT TRACING ON LARGE PROJECTS • Total Installed Cost of heat tracing facilities can be significant on mega projects in Alberta • BDP’s experienced staff could support large EPC firm during FEED with more accurate scoping of heat tracing facilities • BDP’s input during front-end design improves the overall accuracy of FEED cost estimates with lower risk of changes during detailed design and lower schedule impact.

  8. BDP ADVANTAGE

  9. BDP ARE HEAT TRACING SPECIALISTS • We are specialized in heat tracing design, engineering and installation • We have experience on large projects as subcontractor to large EPC firms • Leadership skills of our key people will ensure quality and "fit for purpose" design

  10. BDP IS SMALL AND EFFICIENT • We are small, flexible and react fast • We are very efficient – no wasted hours • We plan our activities well and we stay on schedule and on budget • We have proven track record on previous heat tracing projects

  11. INTEGRATED EPC APPROACH TO HEAT TRACING

  12. INTEGRATED EPC APPROACH TO HEAT TRACING Front-End Design • BDP can provide design input at the front-end of the project (number and layout of steam and condensate manifolds is particularly important at this stage) • Constructability input in early design stages • Our front-end design input leads to accurate and complete scope definition • Well defined scope results in accurate cost estimate

  13. INTEGRATED EPC APPROACH TO HEAT TRACING -continued Detail Engineering and Procurement • Our detailed and organized approach to executing design activities results in quality and fit-for-purpose design • Regular constructability input and review meetings are held during detail design • We keep track of our progress, measure performance during detail design and make corrections where necessary • Procurement and expediting of heat tracing material

  14. INTEGRATED EPC APPROACH TO HEAT TRACING -continued Construction • Effective close-out of detailed design and transition to installation phase • Installation of heat tracing facilities in the module shop and on site • BDP construction group uses non-union affiliated DHL on site • BDP’s sub-contractor NewFab will execute all union work on site • BDP design office will provide on-site engineering support to our construction team

  15. INTEGRATED EPC APPROACH TO HEAT TRACING -continued Fabrication – Cost Advantage • Steam/Condensate Manifolds and Piping fabrication overseas via association with a fabrication shop in South-East Europe for further cost advantage

  16. QUALITY AND SAFETY

  17. QUALITY AND SAFETY • BDP has Quality Program and follows internally established quality procedures • If subcontracted by another EPC firm BDP could follow the firm’s quality program for consistency if necessary • Safety is a core value at BDP. We apply safety principles from front-end and detailed design and procurement to construction • Lessons Learned program used on projects

  18. OUR LOCATION

  19. OUR LOCATION • Detailed design and engineering of tracing facilities will be executed by a dedicated team located in our downtown Calgary office with support from our Edmonton office team. • Office in Edmonton - proximity to refinery sites for field visits, verifications and construction support

  20. DESIGN BASIS AND PROJECT SET-UP

  21. DESIGN BASIS AND PROJECT SET-UP BDP needs the following data to carry out detailed heat tracing design: • P&ID and Line List • 3D Model • Piping Isometrics in AutoCad format • Equipment List and Layout Data transfer through FTP connection. Regular project progress meetings are encouraged.

  22. REFERENCES

  23. REFERENCES Petro-Canada RCP project • Design and Engineering of all steam tracing facilities. • Produced over 15,000 engineering documents and worked off 50,000 hours over 18 months. • Work completed on schedule and under budget. Petro Canada EDD Project, Edmonton AB • Provided Steam Tracing design and Steam Tracing construction support on ISBL Plant 63 and construction support on OSBL. Produced more than 2000 documents ahead of schedule and within the budget. Significantly improved Steam Tracing construction phase by introducing two additional types of documents: Steam Tracing Circuit Log and Manifold Installation Drawing. These documents have become the main reference documents for the construction crew.

  24. REFERENCES - continued Petro Canada SIG / SIG-MOD Project, Edmonton AB • Provided piping design and construction support on ISBL Plant 63 and OSBL Plant 13. Interquiza PTA Plastic Plant, Montreal, QB • Design of manifold locations and interconnecting piping between steam/condensate headers and manifolds. Produced construction isometrics and provided an update to the Rebis Model using team of 19 designers. Steam Tracing isometrics were produced in Calgary using a team of four designers.