An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Pressure drop measurements at CERN

  2. Introduction • Purpose: • measure pressure drops and HTCs for reasonable pipe diameters • Compare to models – understand which model works best for our parameters • Start with straight pipes, 3.175mm and 2.2mm OD, later include bends • Location • Building 158: CORA cooling plant (used for tests for CMS upgrade and ATLAS IBL) • Planning by Richard B, DUTs prepared by Richard F • Local help from Alex Bitadze. This is what Alex and I did from 9/10 to 11/10: • Setup readout box with NTCs and pressure sensor readout • Take temperature calibration points (not clear whether needed with NTCs) • Connect DUT to CORA • Connect power supply to tube (started with 3.175mm tube) • Test that heating and NTCs work (dry run) • Could not run the plant (no expert available)

  3. Setup • Pressure sensors are 1-100 bar relative • Capillary to one pressure sensor too short – for now connected to spare pressure sensor, should be changed • Additionally: one absolute pressure sensor for atmospheric pressure p2 p1 85cm - + - T1 T2 T3 T4 T5 T6 T7 T8 T9 T10 4 6 5 15 15 15 15 15 5 5 4cm p3 (not used)

  4. Pictures

  5. Dry run • Set power supply to 5A, measure 0.42V → estimate tube resistance (2 halves parallel) is 0.84Ω • Power supply did cut out arbitrarily • Will replace it with one of Alex’s supplies • Still, could see that tube is heating, and the correct temperature sensors increase Average between 16:45 and 16:50 Power cutting out

  6. Modifications on input • We need a capillary to fix boiling point to start of DUT • This should be instrumented with pressure and temperature sensors before and after to determine state of fluid before (liquid) and after (two-phase vapour quality) • We might also add a heater after the capillary to be able to shift the input vapour quality • Preferably this would require another pressure sensor before the heater (to take out pressure drop in heater) Tliq From plant To gun case Tliq,pliq + pin pliq pin + + p1 Δh

  7. Next steps • When available, add interlock box • Get right length capillary for downstream pressure measurement • Leak checking • Pressurize system and check that relative sensors work accurately, if not calibrate • Run with CO2, do some measurements • Need to revise test matrix • Change to 2.2mm OD tube • When available, insert input capillary and heater • Change to DUTs with bends