Economically Efficient Transmission Design Processes for a 20% Wind Energy Scenario for the U.S. Eastern Interconnection. Dale Osborn 10:30 AM Friday June 12. 2. 3. NREL Eastern Wind Integration Transmission Study Data. 4.

Download Presentation

Dale Osborn 10:30 AM Friday June 12

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Economically Efficient Transmission Design Processes for a 20% Wind Energy Scenario for the U.S. Eastern Interconnection Dale Osborn 10:30 AM Friday June 12

  2. 2

  3. 3

  4. NREL Eastern Wind Integration Transmission Study Data 4

  5. Transmission planning to date has been focused on meeting National Electric Reliability Corp. reliability standards. Deterministic criteria based on the loss of lines and resources ( generators). Minimum capital for transmission Not necessarily the minimum cost to the customer Energy markets added constraints that allow mainly gas generation to provide reliable service by relieving constraints by locating in higher priced areas Wind energy and other types of generation generally need transmission to gain access to higher priced areas and be able to compete. Reliability (Capacity) vs. Economic Transmission Expansion 5

  6. 6

  7. 7

  8. 20% Wind Energy Scenario Without and With the JCSP Overlay Annual Generator Location Marginal Prices 8

  9. 1 9 JCSP PROMOD outputs - July 22, 2008

  10. 10

  11. 11

  12. Joint Coordinated System Plan Overlay 12

  13. 20% Wind Energy Scenario Without and With the JCSP Overlay Annual Generator Location Marginal Prices 13

  14. 14