1 / 5

AWA Thinks Big: GW & GV/m+ Staging

AWA Thinks Big: GW & GV/m+ Staging. MMM, March 3, 2014 . Scaling w/ freq . PE---R/Q(ohm) remain the same, L~1/f, Power~f^2 if the structure length remain the same and bunch length scales. Accel .---R/Q (ohm) remain the same, L~1/f, Grad.~f for the input power level.

christmas
Download Presentation

AWA Thinks Big: GW & GV/m+ Staging

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. AWA Thinks Big: GW & GV/m+ Staging MMM, March 3, 2014

  2. Scaling w/ freq . • PE---R/Q(ohm) remain the same, L~1/f, Power~f^2 if the structure length remain the same and bunch length scales • Accel.---R/Q (ohm) remain the same, L~1/f, Grad.~f for the input power level WG loss reference: WR90:4%@11.7GHz, WR34 15%@26GHz

  3. Structure combinations Power Extractor Accelerator

  4. How we build and test the 11.7GHz metallic accelerator in a short period of time? SLAC C10 structure AWA C3 structure ( and using the same coupler as the PE) M1 C1 C2 C3 M2 Option1 Brazed Structure Option3 Option2 Vacuum Vacuum Clamped Structure Clamped Structure

More Related