50 likes | 170 Views
AWA Thinks Big: GW & GV/m+ Staging. MMM, March 3, 2014 . Scaling w/ freq . PE---R/Q(ohm) remain the same, L~1/f, Power~f^2 if the structure length remain the same and bunch length scales. Accel .---R/Q (ohm) remain the same, L~1/f, Grad.~f for the input power level.
E N D
AWA Thinks Big: GW & GV/m+ Staging MMM, March 3, 2014
Scaling w/ freq . • PE---R/Q(ohm) remain the same, L~1/f, Power~f^2 if the structure length remain the same and bunch length scales • Accel.---R/Q (ohm) remain the same, L~1/f, Grad.~f for the input power level WG loss reference: WR90:4%@11.7GHz, WR34 15%@26GHz
Structure combinations Power Extractor Accelerator
How we build and test the 11.7GHz metallic accelerator in a short period of time? SLAC C10 structure AWA C3 structure ( and using the same coupler as the PE) M1 C1 C2 C3 M2 Option1 Brazed Structure Option3 Option2 Vacuum Vacuum Clamped Structure Clamped Structure