60 likes | 74 Views
Explore the constraints and outcomes of a network simulation scenario in Lahore due to hardware limitations. Only one EPN was operational, affecting task completion. Results show throughput at each EPN and excessive data from retransmission attempts.
E N D
FLP-EPN Base Case Simulation Scenario CIIT,Lahore
Simulation Parameters *Only 1 EPN could run because of hardware limitations.
Topology FLP250 FLP1 FLP2 Switching Fabric EPN40 EPN1 EPN2 EPN3
Results *Only one time frame building task could be completed due to hardware limitations. One time frame building task required approx. 600GB memory.
Graph Result 1 • Throughput at Each EPN
Graph Result 2 • Excessive Data Caused by retransmission attempts