General Manager HS Yoon

Org chart for inventory management. General Manager HS Yoon. Responsibility. Operation Manager Ken Lee. Champion JW Park. Core team #1. Core team #2. Core team #3. Core team #4. Core team #5. Core team #6. Quality Daniel Lee. Production SY Ahn. Matl ’ & Logis Joonhi Ahn. R & D

chul
Download Presentation

General Manager HS Yoon

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Org chart for inventory management General Manager HS Yoon Responsibility Operation Manager Ken Lee Champion JW Park Core team #1 Core team #2 Core team #3 Core team #4 Core team #5 Core team #6 Quality Daniel Lee Production SY Ahn Matl’ & Logis Joonhi Ahn R & D Michael Chai QAD JH Joo Value Control Anthony Seo

  2. Responsibilities

  3. Tent Location allotment –In-house R-BSM line W/House for R FG #2000 Testroom Shipping & receiving FG #2000 FG #2000 W/House Theta BSM line #2 # 1100 Failure #7000 FG #2000 Matl’ #1000 Theta BSM line #1 # 1100 Tau #1110

  4. Location allotment-Depot & Customers Depot • Kyeongbo (excluding CS Gears) • Hyeondae-Naeja Customers • HMC Ulsan • KMC Hwasung Supplier temporary consignment • Dongbo (Theta BSM shaft  700set, R-eng CM Shaft  565 pcs)

  5. Physical inventory counting Tag

  6. Problems for Inventory counting • Theta Housing U/L Ass’y와 같이 반제품상태로 입고되는 자재의 경우에는 조립된 상태의 수량을 실사한다. • Theta Housing U/L Ass’y가 사내 공정에서 분해되어 단품 상태로 있는 경우는 Ass’y로 환산하여 • 수량을 기록한다. • Theta line #110공정 후 Housing Full ass’y의 경우 실사 후 Ass’y상태의 수량을 그대로 기록한다. •  재고관리 개선을 위해 반제품에 대한 신규로 품번의 부여가 필요함. • Input gear Ass’y, B/S Shaft Ass’y 의 경우 실사 후 단품 상태로 분해된 수량을 기록한다. • (실사 Tag 2장을 사용함) • (예) B/S Shaft Ass’y (DN) : 100set •  B/S Shaft (DN)  100ea •  Transfer gear (DN)  100ea

  7. Master schedule