140 likes | 324 Views
JIT. POM 522. JIT. You should be familiar with the basic JIT concepts by now We will focus on the implications of using JIT for the MPCS. JIT in brief. Overview of JIT effects on MPCS. Front end: APP/MPS will be based on load leveling
E N D
JIT POM 522
JIT • You should be familiar with the basic JIT concepts by now • We will focus on the implications of using JIT for the MPCS
Overview of JIT effects on MPCS • Front end: APP/MPS will be based on load leveling • Engine: number of parts planned and number of levels in BOMs reduced
Overview of JIT effects on MPCS • Back End:
JIT: Human/Organization Elements Whole person concept • (a/k/a respect for people) Implications • Surge capacity + cross-training
JIT: Product Design 3 keys to JIT-style product design: Implications: • Fewer parts in system • Simpler BOMs • Greater standardization of production methods
JIT: Process Design • Standardized product designs • Flexibility
JIT: Process Design: Pull • Key to JIT execution • Requires trained, disciplined workforce • Many ways to execute
JIT: Nonrepetitive Applications • Greater need for volume and mix flexibility • Usually achieved via people
JIT software • Key features: • Another approach: use FPOs in your MRP software
JIT: Designing MPCS • IS • Accounting
JIT: Designing MPCS • Measurements