110 likes | 232 Views
2009 Masterworks in Masonry. Commercial Institutional Load-Bearing. Commercial Masonry. 3rd. NorthCreek - Phase 3. Submitted by: The Gallegos Corp. 2nd. Johnstown Town Hall. Submitted by: Ammex Masonry Inc. 1st. Arrabelle at Vail Square. Submitted by: The Gallegos Corp.
E N D
2009 Masterworks in Masonry • Commercial • Institutional • Load-Bearing
3rd NorthCreek - Phase 3 Submitted by: The Gallegos Corp.
2nd Johnstown Town Hall Submitted by: Ammex Masonry Inc.
1st Arrabelle at Vail Square • Submitted by: The Gallegos Corp. • Owner: Vail Resorts • GC: Shaw Construction • Design Firm: 4240 Architecture
2nd South Adams County Fire District Station No.7 Submitted by: Urbitecture
1st Arvada West High School - Phase 2 • Submitted by: LOA Architects • Owner: JeffCO Public Schools • GCL JHL Constructors • Design Firm: LOA Architects
1st Perriman-Brown Residence • Submitted by: KWS Design • Owner: Janet Perriman & Greg Brown • GC: Janet Perriman & Greg Brown • Design Firm: KWS Design