WP3 - User Communities Support STATUS REPORT Guillermo Díaz (CIEMAT)

WP3 - User Communities Support STATUS REPORT Guillermo Díaz (CIEMAT) on behalf of WP3 Manager, Leandro Ciuffo (RNP) First-year Project Review Brussels, 15.09.2011. WP3 Status Outline. ACHIEVEMENTS OPEN ISSUES PLANS FOR NEXT REPORTING PERIOD CONCLUSIONS.

chuong
Download Presentation

WP3 - User Communities Support STATUS REPORT Guillermo Díaz (CIEMAT)

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. WP3 - User Communities Support STATUS REPORT Guillermo Díaz (CIEMAT) on behalf of WP3 Manager, Leandro Ciuffo (RNP) First-year Project Review Brussels, 15.09.2011

  2. WP3 Status Outline • ACHIEVEMENTS • OPEN ISSUES • PLANS FOR NEXT REPORTING PERIOD • CONCLUSIONS GISELA - First year Project Review - Brussels - 15/09/2011

  3. ACHIEVEMENTS as compared to WP3 objectives WP3 – User Communities Support GISELA - First year Project Review - Brussels - 15/09/2011

  4. WP3 Achievements on supported VRCs • Life Sciences • WeNMR collaboration (EGI TF’10) • Access to WeNMR application portal • Opens some LA sites to “enmr.eu” VO • HealthGrid agreement (EGI UF’11) • Support of “biomed” VO in LA • Exchange of software and experiences • Users could be anywhere in LA or EU • Earth Sciences • Special interest detected in WRF model • Leveraging WRF4G from EELA-2 to new groups in Brazil and Cuba • Simulations in Amazon region • Pollution affecting air quality in atmosphere • World-wide interest (EGI TF’11) • High Energy Physics (HEP) • 4 experiments @LHC accelerator • Pierre Auger Observatory GISELA - First year Project Review - Brussels - 15/09/2011

  5. WP3 Achievements on supported VRCs • Overall list of apps & VOs supported per VRC: • Evolution of supported groups in LA… Local support at the RC level (new comers) Central support at LGI / GSC level (VOs) GISELA - First year Project Review - Brussels - 15/09/2011

  6. WP3 Applications Portfolio • 70 legacy grid applications inherited from EELA & EELA-2 • 34 of them are in a production stage • Not all of them running on regular basis, but… • Can be provided at anytime upon users request in LA • MoU signed with EGI-InSPIRE (M08) enables… • VRC members in Europe exploit GISELA resources • VRC members in LA exploit EGI resources (most usual) • EGI/GISELA to coordinate VRC support in every EGI forum • Publishing GISELA applications in http://appdb.egi.eu/ GISELA - First year Project Review - Brussels - 15/09/2011

  7. WP3 Infrastructure usage statistics • Accumulated CPU-hours, grouped by VOs: • Identified main consumers: • LHC experiments (HEP) • Training events • New comers with new applications • Use of computing resources varies with time… • Some sites are not capable of supporting HEP VO(s) • Smaller applications generate burst-demand of resources GISELA - First year Project Review - Brussels - 15/09/2011

  8. WP3 Achievements on Users support • 3 major training events • Jointly organized with EPIKH and CHAIN • Venues: • Mexico City • Valparaiso, Chile • Sonora, Mexico • 40 self-training documents available • Tagged and categorized • Multiple user profiles • 8 articles related to WP3 activity • SpringerLink (2) • Journal of Grid Computing (1) • Proceedings of the HPC LA Symposium (1) • IBERGRID’2011 (1) • iSGTW (3) GISELA - First year Project Review - Brussels - 15/09/2011

  9. OPEN ISSUES and deviations from the work plan WP3 – User Communities Support GISELA - First year Project Review - Brussels - 15/09/2011

  10. WP3 Open Issues • Slow start of CLARA TT on WP3 matters • CLARA TT WP3 person nominated in Q3 • CLARA TT is not yet fully engaged within WP3 activities • CLARA & NRENs are prospecting communities… • Difficulties to make them understand GISELA grid as a tool for e-Science • Usage of e-Infrastructures not yet at the expected level • Complete saturation of infrastructure on regular basis is a tough goal • Demand of resources coming in burst from smaller groups in LA • Some LA sites cannot comply specific requirements (disk size, network bandwidth, MPI environment, 64-bit calculations, etc.) GISELA - First year Project Review - Brussels - 15/09/2011

  11. PLANS for the next reporting period WP3 – User Communities Support GISELA - First year Project Review - Brussels - 15/09/2011

  12. WP3 Plans for 2nd Year • At least two more major training events • Possibly in cooperation with EPIKH, CHAIN and/or DEGISCO projects • Foster higher exploitation of e-Infrastructures • Leveraging WRF4G (Brazil, Cuba, but world-wide also) • High demand of resources is expected from the “biomed” VO • Enabling more RCs to support HEP VO(s), in cooperation with WP4 • Reaching new CLARA communities (social, cultural) • Approach to industry-related communities • Providing a Scientific Gateway (web portal), in cooperation with WP6 • Stimulating usage of grid resources • New WP3 VRC-driven website • Replacing contents currently available at http://applications.gisela-grid.eu • Handover of user communities support activities to CLARA TT GISELA - First year Project Review - Brussels - 15/09/2011

  13. CONCLUSIONS after the 1st year activity WP3 – User Communities Support GISELA - First year Project Review - Brussels - 15/09/2011

  14. WP3 Conclusions • WP3 is in good shape accomplishing its 1st year quality metrics • Despite difficulties reported during the Crash Program • Much help came, and is expected to come, from: • Signed MoUs with EGI.eu, EGI-InSPIRE and EPIKH • Close cooperation with CHAIN project • Plans are proposed for 2nd year seeking… • Success of WP3 activities • Contribution to long-term sustainability of e-Infrastructures in LA • Involvement of CLARA TT is required to take the baton GISELA - First year Project Review - Brussels - 15/09/2011