An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Ron Ciesiel SPP Compliance Director 2007 COMPLIANCE PROGRAM PREVIEW

  2. 2007 Compliance Program Attributes • 52 Reliability Standards [versus 38 in 2006] • CIP Standards [CIP 002 to CIP 009] • On-site Compliance Reviews • On-site Readiness Audits

  3. NEW STANDARDS FOR 2007 • COM-001-0 [Requirements 2 and 5] TELECOMMUNICATIONS • Transmission Operators, Balancing Authorities, NERCNet User Organizations • Manage, alarm, test or actively monitor vital telecommunications facilities • Attention to emergency telecommunications facilities • Written procedures for the loss of facilities

  4. NEW STANDARDS FOR 2007 • Var-001-1 Voltage and Reactive Control • Transmission Operators, Purchasing-Selling Entities • Monitor and control voltage levels and MVAR flows • Reactive reserve monitoring and acquisition • Status of generator voltage regulators and power system stabilizers • SEE SPP Criteria 7.8 • SEE SPP Voltage & Reactive Management Taskforce WHITE PAPER

  5. NEW STANDARDS FOR 2007 • FAC-008-1 Facilities Ratings Methodology • FAC-009-1 Establish/Communicate Facility Ratings • Transmission Owner, Generation Owner • Basis for methodology used in developing facilities ratings • SEE SPP Criteria 12 • Ratings must be available to the Reliability Coordinator and other authorities

  6. NEW STANDARDS FOR 2007 • MOD-024-1 Generator Gross & Net Real Power Capability • SPP, Generation Owner • SPP must develop criteria for generation owners • SEE SPP CRITERIA 12.1 • Generation owners must verify real power capability, based on SPP Criteria, beginning 1-1-2007 • No phase-in period

  7. NEW STANDARDS FOR 2007 • Mod-025-1 Generator Gross & Net Reactive Power Capability • SPP, Generation Owner • SPP must develop criteria for generation owners • SEE SPP CRITERIA 12.1 • SEE SPP CRITERIA APPENDIX 10 • Generation owners must begin verifying reactive power capability beginning 1-1-2007 • 5-year phase in program [20% per year]

  8. NEW STANDARDS FOR 2007 • PRC-021-1 Under-voltage Load Shedding Program • Transmission Owners, Distribution Owners • Equipment installed on the Bulk Electric System or to mitigate voltage issues on the BES must keep a database of information: • 5 data points for each system • Annual updates to database • SPP will maintain regional database of UVLS systems • SEE SPP Criteria 7.5

  9. NEW STANDARDS FOR 2007 • CIP-002-1 THROUGH CIP-009-1 • Critical Infrastructure Protection Standards • Review will be given tomorrow morning

  10. ON-SITE ACTIVITIES • SPP Field Reviews • Sponsored by SPP • Independent Contract Auditors • SPP Compliance Staff • NERC & FERC observers • Focus on monitored standards in annual program • NERC Readiness Audits • Sponsored by NERC and SPP • NERC Staff auditor • SPP Compliance Staff • Industry volunteers • FERC staff • Broad based review of activities

  11. 2007 ON-SITE VISITS [TENTATIVE LIST]

  12. Kevin GoolsbyEngineer III, Compliance501-614-3275kgoolsby@spp.org Ron CiesielDirector of Compliance501-614-3265rciesiel@spp.org