1 / 12

PMT test setup in Erlangen

PMT test setup in Erlangen. Oleg Kalekin University of Erlangen. Meeting. Pylos, 16.04.2007. PMT Test Setup Charge response. Pulser (custom made): Rate  10 kHz FWHM 10ns Variable amplitude Dark Box: Copper shielding Various diameter PMT holders ADC LeCroy 2249A

chyna
Download Presentation

PMT test setup in Erlangen

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. PMT test setup in Erlangen Oleg Kalekin University of Erlangen Meeting Pylos, 16.04.2007

  2. PMT Test SetupCharge response Pulser (custom made): • Rate 10 kHz • FWHM 10ns • Variable amplitude Dark Box: • Copper shielding • Various diameter PMT holders ADC LeCroy 2249A • No. of channels 12 • No. of Bits 10 • Full scale 256 pC 16.04.2007 KM3NeT Meeting, Pylos

  3. PMT Test SetupCharge response • Pulser (custom made): • Rate 10 kHz • FWHM 10ns • Variable amplitude • Dark Box: • Copper shielding • Various diameter PMT holders • Diaphragms • ADC LeCroy 2249A • No. of channels 12 • No. of Bits 10 • Full scale 256 pC 16.04.2007 KM3NeT Meeting, Pylos

  4. PMT Test SetupCharge response • Pulser (custom made): • Rate 10 kHz • FWHM 10ns • Variable amplitude • Dark Box: • Copper shielding • Various diameter PMT holders • Diaphragms • ADC LeCroy 2249A • No. of channels 12 • No. of Bits 10 • Full scale 256 pC 16.04.2007 KM3NeT Meeting, Pylos

  5. PMT Test SetupCharge response Reconstruction of single-/multiple- photoelectron response Model(*): • 1st dynode: if  mean number of ph.e., probability to detect n ph.e. = P(n, ) - Poisson function • Anode: single ph.e. charge = G(Q1,1) – Gaussian n ph.e. charge = G(Qn,n), Qn=n•Q1 , 2n= n•2n • PMT charge response: P(i,)•C(i)•exp(-(x-Qi)2/(22i)), i=1,2,… Qi=i•Q1, 2i= i•21, C()=1/ 2 • 0 ph.e. (pedestal): P(0, )=exp(- ), if N – total number of event, number of pedestal events N0=N•exp(- ), and then =-ln(N0/N) can be used as first estimation of mean number of ph.e. • Fit method: 2-minimizing with , Q1 , 1 as fit parameters • Software: ROOT Version 5.08/00 (*) E.H. Bellamy, et al., NIM A 339 (1994) 468-476 16.04.2007 KM3NeT Meeting, Pylos

  6. PMT Test Setup Charge response Reconstruction of single-/ multiple- photoelectron response: simulations 16.04.2007 KM3NeT Meeting, Pylos

  7. PMT Test Setup Charge response Reconstruction of single-/ multiple- photoelectron response 16.04.2007 KM3NeT Meeting, Pylos

  8. PMT Test SetupAbsolute and Spectral Calibration • Monochromator LOT-Oriel MS301 fully automated 350-900 nm • Tungsten lamp • PMT bases for QE measurements 16.04.2007 KM3NeT Meeting, Pylos

  9. PMT Test SetupAbsolute and Spectral Calibration • Monochromator LOT-Oriel MS301 fully automated 350-900 nm • Tungsten lamp • PMT bases for QE measurements 16.04.2007 KM3NeT Meeting, Pylos

  10. PMT Test SetupAbsolute and Spectral Calibration • Monochromator • LOT-Oriel MS301 • fully automated • 350-900 nm • Tungsten lamp • PMT bases for QE measurements 16.04.2007 KM3NeT Meeting, Pylos

  11. Photonis PMTs • 10" PMT ordered, expected to be delivered end of April • 3" PMT will be provided by NIKHEF Euro/cm2 3.72 7.48 2.72 3.54 3.26 3.20 Diam/Area inch/cm2 9/380 5/120 10/600 9/380 8/400 12/670 16.04.2007 KM3NeT Meeting, Pylos

  12. Summary • PMT test setup in Erlangen works • Further development is in progress to cover all important PMT characteristics • Tests of Photonis PMTs will start soon • Hamamatsu PMTs will be evaluated to order • Methods, codes, results will be posted on the KM3NeT Portal 16.04.2007 KM3NeT Meeting, Pylos

More Related