1 / 14

Experience from programming period 2004-2006 Audit findings & Winding-up activities

Experience from programming period 2004-2006 Audit findings & Winding-up activities. Ministry of Finance Audit Authority Department Jiri Pesina Unit of ERDF, EFF, ESF programmes CONFERENCE NEW MEMBER STATES 18. – 20. APRIL 2011, PLZEŇ. Outline.

cian
Download Presentation

Experience from programming period 2004-2006 Audit findings & Winding-up activities

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Experience from programming period 2004-2006 Audit findings & Winding-up activities Ministry of Finance Audit Authority Department Jiri Pesina Unit of ERDF, EFF, ESF programmes CONFERENCE NEW MEMBER STATES 18. – 20. APRIL 2011, PLZEŇ

  2. Outline • Closure of assistance 2004 – 06 period in Czech Rep. • Winding-up methodology (manual – checklists) • Winding-up process • Audit findings • Winding-up barries • Submission of documents to EC • Open issues • Experience made

  3. Closure of assistance 2004 – 06 period in Czech Rep. Operational programmes – Objective 1 • OP Human Resources Development – ESF • OP Rural Development and Multifunctional Agriculture – EAGGF, ESF • OP Industry and Enterprise – ERDF • OP Infrastructure - ERDF • Join Regional OP – ERDF, ESF

  4. Closure of assistance 2004 – 06 period in Czech Rep. • Operational programmes – Objective 2 Single Programming Document for Prague – ERDF • Operational programmes – Objective 3 Single Programming Document for Prague – ESF

  5. Closure of assistance 2004 – 06 period in Czech Rep. • EQUAL – ESF • INTEREG IIIA (5X) – ERDF • INTEREG IIIB – ERFD • INTEREG IIIC – ERDF • ESPON – ERDF • INTERACT - ERDF

  6. Closure of assistance 2004 – 06 period in Czech Rep. • ISPA/CF transport section – 8 projects • ISPA/CF environmental section – 13 projects • ISPA/CF technical assistance – 5 projects • CF transport section – 5 projects • CF environmental section – 25 projects • CF technical assistance – 1 projects

  7. Winding-up methodology (manual – checklists) • EC Closure Guidelines from year 2006 KOM(2006)3424 • Towards a Successful Closure of Structural Funds 2000-2006 Programmes - Answers & Questions and its annexes from 2009,2010 • AA-WuB winding-up guideline for performing the closure audit work (from 2009, updated 2010) A manual was elaborated with E&Y contribution

  8. Winding-up process • Desk checks of system audits and sample checks reports (AA-WuB supervision, participation) • Desk checks of SAO reports • Desk checks of EC, ECA reports (AA-WuB participation) • Own on-the-spot checks (MA, IB, CA, FB)

  9. Audit findings • Sample checks findings • Irregularities: • In most cases, non-elegible project costs and its accounting (accounting records); • Breaking public procurement rule. • System audits findings • Stabilization HR (historical memory); • Methodology (Audit trail);

  10. Winding-up barries • Irregularities (following and clearing up irregularities); • Methodology (should be standardised as far as possible); • Open findings, additional review of AA-Wu-B declaration;

  11. Submission of documents to EC - MA sends the final implementation report after approval from the MC • PA sends final declaration of expenditure, list of operations, list of irregularities and reimbursements • AA-Wu-B attaches final audit report and winding up declaration Documents were sent as a package (via Perm. Rep.) • 2003 – first CZ winding-up with CF projects • 2010 / 03 – first CZ winding up with operational programme

  12. Winding-up: open issues EC reaction: • Ask for additional information related to irregularities, confirmation data sent; • Additional audit on winding-up envisaged in one case (from DG REGIO in May 2011);

  13. Experience made • Closure procedure takes more time and energy than expected: • Setting up the deadlines for collection of Management ‘Closure documents is necessary. • The work to be done and the timetable should be scheduled in cooperation with every participating body (MA, IB, CA, AA-Wu-B) necessary;

  14. Thank you for listening Ministry of Finance of the Czech Republic Depatrment of Audit Authority Unit 523 – Audit of ERDF, ESF and EFF programmes jiri.pesina@mfcr.cz