RUNWAY 28 EXTENSION Stakeholders Meeting

RUNWAY 28 EXTENSION Stakeholders Meeting. April 17, 2013. Updates Since Last Meeting: Runway 28 Extension Decreased duration of reduced runway length – NOW = 10 days Relocation of existing PAPI prior to threshold relocation Installation of temporary REIL for threshold relocation

Download Presentation

RUNWAY 28 EXTENSION Stakeholders Meeting

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. RUNWAY 28 EXTENSIONStakeholders Meeting April 17, 2013

  2. Updates Since Last Meeting: Runway 28 Extension Decreased duration of reduced runway length – NOW = 10 days Relocation of existing PAPI prior to threshold relocation Installation of temporary REIL for threshold relocation ASOS relocation time: ONE DAY. (to be schedule after glide slope relocation) Runway opens to 6,900’ length after 10 day threshold relocation is over Runway Overlay and Marking Night work Runway 10/28 Maintenance of standard markings Day work Runway 18/36

  3. 10 10 Reopen Runway 6,900, (Localizer only) 9/13/13 9/13/13 7 FAA Publishes flight procedures (Full ILS) 12/13/13 12/13/13 1 12/13/13 1

  4. Phase I NOTE: Aircraft must use Taxiway G to access the end of Runway 28 Construction Access

  5. Phase II NOTE: Aircraft must use Taxiway D to access the end of Runway 28 Construction Access

  6. NOTES • Aircraft departing Runway 28 must back-taxi from Taxiway H and turn around on the runway for maximum available takeoff length. • Aircraft landing Runway 10 and traveling beyond Taxiway H must turn around on the runway and back-taxi in order to exit the Runway via Taxiway H Phase III End Runway 10 5,500 ft. Construction Access End Runway 28 5,900 ft.

  7. Final PAPI Glide Slope