Dahlia Ponds Tunnel Project . Presented By: Nathan Soule, PE, PG Brierley Associates & Brenden Tippets, Project Executive, BTrenchless. Dahlia Ponds Tunnel Project Case History . Dahlia Ponds Tunnel Project . Outline. Owner’s Approach Design & Engineering Construction.
E N D
Dahlia Ponds Tunnel Project Presented By: Nathan Soule, PE, PG Brierley Associates & Brenden Tippets, Project Executive, BTrenchless Dahlia Ponds Tunnel ProjectCase History
Dahlia Ponds Tunnel Project Outline • Owner’s Approach • Design & Engineering • Construction
Dahlia Ponds Tunnel Project Project Location
Dahlia Ponds Tunnel Project Project Location
Dahlia Ponds Tunnel Project Modified Design-Build • Denver Urban Drainage needed a new approach to tunnel construction • Past problems with O’Brian Canal Tunnel • Hired tunneling expert – Brierley Associates (Lyman Henn division) • Retained Qualified Contractor BTrenchless early on • Independent estimator – Bids must be within 10%
Dahlia Ponds Tunnel Project Engineering • Evaluate feasible/allowable methods • Subsurface exploration with Contractor involvement
Dahlia Ponds Tunnel Project Test Pits • Cobbles & Boulders • Groundwater
Dahlia Ponds Tunnel Project Tunneling/Trenchless Methods
Dahlia Ponds Tunnel Project Trial Horizontal Directional Drill • Multiple Attempts • Stopped by cobbles/boulders • Determined guided ram not feasible • Team decided on microtunneling for I-76
Dahlia Ponds Tunnel Project Team Effort
Dahlia Ponds Tunnel Project Project Purpose • BTrenchless completed one 240 LF microtunnel and one 60 ft rescue tunnel. • Design/build of two tunnels for storm sewer, including test pits of existing ground conditions. • 240 LF of 54” Tunnel to be completed without disruption of above I-76 highway. • 60 LF of 84” rescue Tunnel to be completed online and grade to match existing failed tunnel 30 ft below grade.
Dahlia Ponds Tunnel Project Project Scope • Various construction methods used to account for the diverse ground conditions: • Microtunnel • Hand Tunnel • Sizes of the installed tunnels ranged from 54” to 84” diameter.
Dahlia Ponds Tunnel Project Project
Dahlia Ponds Tunnel Project Microtunnel Machine AKKERMAN Microtunnel Boring Machine SL 51 125 HP Head
Dahlia Ponds Tunnel Project Microtunnel Machine
Dahlia Ponds Tunnel Project Microtunnel Machine Akkerman MC-4 Jacking Frame
Dahlia Ponds Tunnel Project Separation Plant DERRICK Separation Plant (3) FLC 2000 4-Panel High “G” Shaker Decks (1) FLC 2000 Mud Cleaner Hydrocyclone System
Dahlia Ponds Tunnel Project Separation Plant
Dahlia Ponds Tunnel Project Separation Plant
Dahlia Ponds Tunnel Project Quantifying Material (Onboard Weighing System ) • Product Totals • Multiple Point Weighing • Split Weighing • Auto Target Function • Auto Tare Function • Error Alarms • Data Fields • Unit Conversion • Multiple Batching Modes • Tip-off Weighing • Zeroing • Auto Add Mode • Data Analysis • Remote Add Button
Dahlia Ponds Tunnel Project Entry Shafts GME – Slide Rail System
Dahlia Ponds Tunnel Project Exit / Entry Seal Microtunnel Inc. Entry Seals
Dahlia Ponds Tunnel Project Generators 400 KW Generator 550 KW Generator (3) 75 KW Generators
Automatic Bentonite Injection System • Dahlia Ponds Tunnel Project • MICROTUNNELING, INC.
Dahlia Ponds Tunnel Project Dewatering System Ground water contamination treatment: (6) Weir tanks (1) Air Sparging 300 cfm (4) Mezzi air injection units
Dahlia Ponds Tunnel Project Known Significant Challenges • Schedule • Purchase of Equipment- Short time frame • Shaft Construction • Contaminated ground water up to 2000 GPM • Shallow cover of tunnel under I-76
Dahlia Ponds Tunnel Project Proposed Solutions
Dahlia Ponds Tunnel Project Scheduling Successful scheduling- project completed 30 days ahead of original schedule. Provide the owner with feasible schedule in order to anticipate possible changes.
Dahlia Ponds Tunnel Project Proposed Solutions
Dahlia Ponds Tunnel Project Proposed Solutions
Dahlia Ponds Tunnel Project Shaft Construction
Dahlia Ponds Tunnel Project Proposed Solutions
Dahlia Ponds Tunnel Project Contaminated ground water • Treatment of 2000 GPM system • Treatment of • Dissolved Manganese • Total Iron • Dissolved Iron
Dahlia Ponds Tunnel Project Proposed Solutions
Dahlia Ponds Tunnel Project Shallow cover • Slurry returning to the surface Install foam injection to stabilize face
Dahlia Ponds Tunnel Project Completion of Work • Overall BTrenchless completed the two tunnels in 3 months, including all structures and appurtenances approximately 1 month ahead of schedule • Maintained good relationships with owner, engineers and the community, with little disruptions
Dahlia Ponds Tunnel Project Lessons Learned • Think outside of the box (never accept “this is how we’ve always done it”) • Practice teamwork and adhere to advice from other industry leaders • Success comes from lessons learned
Questions? • Dahlia Ponds Tunnel Project