New and Modified Work Book Templates. Florida Department of Environmental Protection. April 26, 2012 Jack Roberts Petroleum Cleanup Section One Bureau of Petroleum Storage Systems. Section A : Packaged Work Scopes. A-1: Pumping Test or Multi-Phase Pilot Test (In House).
E N D
New and Modified Work Book Templates Florida Department of Environmental Protection April 26, 2012 Jack Roberts Petroleum Cleanup Section One Bureau of Petroleum Storage Systems
A-1: Pumping Test or Multi-Phase Pilot Test (In House) • The base hrs have been changed from 12 to 10, kits from 120% to 100% • Excluded permit hrs and NPDES fee • Can now task any combination of whole or partial days (1/10 day) • Should be adjusted to nearest 1/10 day actual 3
A-2: Air Sparging And/Or Vapor Extraction Pilot Test (In-House) • Merged prior separate single or combined templates • Changed base hrs from 14 to 10, kits from 140% to 100% • Excluded permit hours • Can now task any combination of whole or partial days by 1/10 • Should be adjusted to nearest 1/10 day actual 4
A-2: Air Sparging And/Or Vapor Extraction Pilot Test (In-House) Before After 5
A-3: Monthly O&M Visit • Can be used for in house inspection to evaluate DEP-owned equipment not located at subject property for potential re-use reservation • Do not use for subcontractors 6
A-4, 5, 6: Small Medium & Large RAI Monthly Allowances • Added water level measurements 7
B-1: Proposal Preparation • Excluded for LTNAM work orders or when only task is RAP, RAPMOD or continuation of on-going NAM or PARM 9
B-4: Site Health & Safety Plan • Must be comprehensive • Not allowed more than once per contractor, except in extenuating circumstances 10
B-5: Notice Of Discovery of Contamination Package • Includes copies of existing contamination plume maps 11
Section C : Field Activities • C-3 & 4: Drilling Setup • Now 1 & 2 person options with corresponding 1 or 2 person kit • Changed 2 hrs to 1 hr/person and 20% to 10% kit • Excluded time for on/off site utility clearance • Does not apply to well abandonment or DPT, but may apply to drilling with auger attachment only of DPT rig 13
Section C : Field Activities • C-5 through 16: SB for Soil Screening or Piezometer Install (all depths) & Single or Double Cased Well Installation Up to 40 ft • Now 1 & 2 person options with corresponding 1 or 2 person kit 14
Section C : Field Activities • C-17 through 22: Single Cased Recovery or Multi-Phase Well Installation/Injection Well Installation/Soil Vapor Extraction Well Installation (all up to 40 ft) • Now 1 & 2 person options with corresponding 1 or 2 person kit • Added multi-phase wells and injection wells • Changed MW installation kit to piezometer or remediation well installation kit • Excludes TOC survey if applicable • Includes ½ hr for development 15
Section C : Field Activities • Well Install: Single Case/Multi Case/ Recovery/AS/Soil VE < 40’(> 40’ use backup spreadsheet and enter in Section D: Other Field Work) 16
Section C : Field Activities • C- 23: Well or Piezometer Abandonment • One Person • Added 10% modified level D • Added 10% per diem 17
Section C : Field Activities • C-25, 26, 29, 30: Well Sampling with Water Level and Area Survey • Now 1 & 2 person options with corresponding 1 or 2 person kit 18
C-31 Through 34: Oversight Kits & Per Diem • All may be tasked in any* combination of whole or partial day (1/10 day) • *Per diem requires > 1 consecutive day of field work, otherwise prorated to 1/10 day • Oversight Kit is 2 person soil assessment kit less per diem (one size fits all) • For field work (includes required sampling and testing equipment) • Oversight Allowance has vehicle and modified level D for 2 persons (one size fits all) • For use when sampling/testing equipment is not required 19
Section C: Field Activities Before After 20
H-1: General/SA Report • Changed 25% to 20% of field work in sections C & D • Not used after SAR approval • Reiterate existing $10K cap per work order 22
H-2: Letter/NPDES Report • Though limited to quarterly, includes 3 monthly discharge reports on DEP form 62-620.910(10) 23
H-4: O&M Annual Report • Must be signed and sealed by registered P.E. 24
H-7 Through 10: RAP or RAPMOD, All Levels, Full & Limited Scope • Must be signed and sealed by registered P.E. • No proposal prep allowed if only scope of work 25
H-14: Construction Drawings and Specifications • Generally not allowed in conjunction with source removal work orders 26
H-15: Bid Package, Solicitation and Evaluation • This document should be prepared either subsequent to or concurrent with the preparation of construction drawings (used to say prior to) 27
H-19: Long Term Natural Attenuation Plan • For LTNAM only • No proposal prep if only scope of work 28
H-20 & 21: RA Interim and General RA Reports • Use depends on the level of effort • See Template Descriptions in Appendix A.1 • See SOP Section 5.8.3 for template report options for SSA during RA Phase 29 September 25, 2007
Section H: Office Activities, Part II Before After 30
Template Report Options for SSA During RA Phase • Section 5.8.3 – Three template report options • H-20: RA Interim Report – use directly if sampling 10 or less MWs or installing & sampling 3 or less MWs/borings • H-21: RA General Report – use equivalent in ‘Other’ report type (H-26) if sampling 10 to 20 MWs or installing & sampling 4 to 10 MWs/borings • H-17: Soil Source Removal Report – use equivalent in ‘Other’ report type (H-26) if sampling more than 20 MWs or installing & sampling more than 10 MWs/borings 31
Template Equipment Kits (18) • All kits, except In-House RAC, FP Recovery and Oversight split into 1 & 2 person options • Added Oversight Kit (with equipment) and Oversight Allowance (no equipment), excludes per diem, one size covers 1 or 2 persons • Added wash tubs, garbage can/bags, rake, sample labels and step ladder to example expendables list 32
SOP Appendix A.1 • The preapproval template workbooks, template descriptions, template breakdown, and template equipment kit rate schedules can be found in SOP Appendix A.1 • THE END 36