An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Quantity SurveyCase Studies S A Reddi Member, Arbitration Tribunal

  2. Tripoli West Thermal Power Station Excavation for Foundation

  3. Ganga Bridge Patna Well Foundation 10

  4. Pamban Bridge Price Variation Clause

  5. Pamban Bridge Interest on Delayed Payment

  6. Pamban Bridge First Contract

  7. Zuari Bridge Delay Due to Variation In Foundation Strata

  8. Nepal Bridges Artesian Conditions

  9. Narayani Bridge Change in Foundation Design

  10. Ganga Bridge Patna Reduction in Labor Working Hours

  11. Ganga Bridge Patna Artesian Conditions

  12. Adavi Nainar Koil Dam Tower Crane Collapse

  13. Orissa Mahanadi Barrage Reduction In Working Hours

  14. Orissa Road Project Appointment of DRB

  15. Tata Power Station Trombay Short Weight Cement Bags

  16. Tata Power Station Trombay Reinforcement Bar Lengths

  17. Srisailam Cofferdam Rates Revised Due to Accelerated Construction