Theory Of Constraints (Eli Goldratt) The Productivity Choice. G OLDRATT Group SA. Presenter: Henning du Preez Managing Director Goldratt Group Southern Africa. TOC Mining. A Theory of Constraints Application. Run of Mine Tons per day (Opencast). Proven Process Capacity. 40%.
E N D
Theory Of Constraints (Eli Goldratt) The Productivity Choice • GOLDRATT • Group SA Presenter: Henning du Preez Managing Director Goldratt Group Southern Africa TOC Mining A Theory of Constraints Application
Run of Mine Tons per day (Opencast) Proven Process Capacity 40% GOLDRATT Group SA 60% TOC Mining A Theory of Constraints Application
Reef Tons Hoisted per day (Underground) Proven Pocess Capacity 40% GOLDRATT Group SA 60% TOC Mining A Theory of Constraints Application
THE BARRIER to Productivity Proven Process Capacity 40% Barrier Productivity of the process < 70% (Across mining types, across continents, across companies) Are we all facing the same type of productivity barrier ? GOLDRATT Group SA 60% TOC Mining A Theory of Constraints Application
Theory of Constraints One bottleneck per process (A chain is only as strong as its weakest link) Root Cause behind the 60% BARRIER = The bottlenecks are managing us versus we are managing the bottleneck • GOLDRATT • Group SA Dr Eli Goldratt was an Israeli physicist who became a business management guru. He was the originator of Theory of Constraints. TOC Mining A Theory of Constraints Application
Theory of Constraints How do you know if the bottlenecks are managing us? Symptoms of the root cause -> Bottlenecks developing (daily & weekly) there where we can least afford to have them. -> Constant changing priorities and fire fighting (management don’t have time) -> De-motivated people (people are blamed for all the problems) ->Ave daily production <70% of proven Capacity ->Falling short of required targets GOLDRATT Group SA Dr Eli Goldratt was an Israeli physicist who became a business management guru. He was the originator of Theory of Constraints. TOC Mining A Theory of Constraints Application
Manage your BOTTLENECK increases the process PRODUCTIVITY dramatically We manage the Bottlenecks Bottleneck managing us GOLDRATT Group SA Implemented the Theory of Constraint Way of managing a Bottleneck TOC Mining A Theory of Constraints Application
Underground Mine (on one level) 80% 67% GOLDRATT Group SA Implemented the Theory of Constraint Way of managing a Bottleneck TOC Mining A Theory of Constraints Application
The Future of Mine Planning and Design Decide where the bottleneck should be Underground => The Cleaning Cycle must be stronger than the Blasting Cycle [Today it is frequently the opposite] Opencast => The mining side must be stronger than the plant side Planning, Budgeting and Measuring => Plan to meet 80% of your bottleneck performance consistently => Budget for the required buffers for reliability and consistency of performance => Continuously measure your constraint rate and the status of your buffers (single measure single priority) GOLDRATT Group SA TOC Mining A Theory of Constraints Application
The Productivity Choice Let’s move from a marginal mine (65%) to a mine with a margin (80%) – From bottlenecks managing us to us managing our bottlenecks. The Choice is yours! GOLDRATT Group SA TOC Mining A Theory of Constraints Application