30 likes | 157 Views
Z. W = 2Z. W. Question 1-c. Question 1-e. Question 1-d. N. heated zone. S. Question 1-f. Question 1-i. s max. Point (r, ). s r. s min. B. radius, r. s q. angle, q. p i. A. R. Conditions for the Problem: s max / s min = 1.5 p i = 0.8 s min. . h. A. H. . .
E N D
Z W = 2Z W Question 1-c Question 1-e Question 1-d N heated zone S Question 1-f Question 1-i
smax Point (r, ) sr smin B radius, r sq angle, q pi A R Conditions for the Problem: smax/smin = 1.5 pi = 0.8 smin h A H B Question 4
400 m sea water 500 m muds g = 1.8 g/cm3 2000 m shale g = 2.40 g/cm3 1000 m sands, shales g = 2.25 g/cm3 Earthquake event 4000 m A Salt diapir slough 200 m 2000 m Tunnel - 6 m f Parallel to the bedding of alternating limestones and shales interbedded at 0.3 to 2 m thickness Slope in massive igneous rock with mild schistosity parallel to slope face