1 / 22

会議報告 Cost Management Group Meeting at DESY 2008.05.05 – 08

会議報告 Cost Management Group Meeting at DESY 2008.05.05 – 08. 設楽 哲夫 LC GDE 報告会  2008.05.12. http://ilcagenda.linearcollider.org/conferenceDisplay.py?confId=2709 Password Protected. Challenges & Issues. RDR – 1年を経過 過去の遺産か? 日に日に忘れられて行く

ciro
Download Presentation

会議報告 Cost Management Group Meeting at DESY 2008.05.05 – 08

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. 会議報告Cost Management GroupMeeting at DESY 2008.05.05 – 08 設楽 哲夫 LC GDE報告会 2008.05.12 http://ilcagenda.linearcollider.org/conferenceDisplay.py?confId=2709 Password Protected Global Design Effort

  2. Challenges & Issues • RDR – 1年を経過 • 過去の遺産か? • 日に日に忘れられて行く • 緊急課題: VALUE estimate と RDR design documentとのtraceability • 2012までのプログラムの遅れ • Accelerator physics designの役割は? • RDR は今でも十分か? • Limited resources: DR, BDS, sources significantly reduced • But management still in place and on-board • How best to use this group? Keep motivation? Global Design Effort

  3. Challenges & Issues • In a predominantly R&D phase, who is worrying about the collider design? • Despite above comments, AP&D is still critical during TD Phase I • Cost Containment / Reduction • Need to demonstrate clear effort to re-evaluate the design and reduce the cost • “Minimal” 200-500 GeV Collider Concept • Strategic planning • Updated (new!) value estimate will be critically reviewed • Internally in 2010 • Publically in 2012 Global Design Effort

  4. Cost Management Group • Small focus group to “manage the costs” • Take top-level ownership • Forward planning to critical cost review • Philosophy / Structure / implementation • Update review 2010 (internal) • New value estimate 2012 (external) • Push-back on the design (cost awareness) Global Design Effort

  5. Cost Management Group • “Task Force-like” (prefer think-tank) • Goals • Re-structure and consolidate existing cost information for “better access” • New tool • Examine the cost data for inconsistencies, discrepancies, questionable entries, missing information • Re-establish traceability with RDR design requirements (together TAG leaders) • Or identify missing information that needs to be supplied • Prepare for cost-reduction design scenarios • Coordination with TAG leaders / technical groups essentially • Primarily via PM, APM, PMO Global Design Effort

  6. Cost Management Groupメンバー • PMs: M. Ross, N. Walker, A. Yamamoto • Cost Engineers: W. Bialowons, P. Garbincius, T. Shidara • APMs: J. Carwardine, F. Lehner • PMO: E. Elsen, E. Paterson • Others: T. Himel, +++ Global Design Effort

  7. Defining our (CMG) Goals review: start here Global Design Effort

  8. Elements: VALIDITY What documentation will we require for a critical cost review? How do we intend to present it? Global Design Effort

  9. Elements: TRACEABILITY • Critical link between design and cost-estimate documentation • Understanding the formal link between the two: • Maintaining integrityRole of change control ( Toge)Initial configuration (consolidating RDR) Global Design Effort

  10. Elements: COMPLETENESS • Definition of (i.e. level of detail) must be defined up-front • Use RDR value estimate as a guideline (e.g. 1% level) • Build ‘ideal’ CBS structure (based on above) • Understand how current information maps to ideal structure • Where is information missingWhat to do with too-detailed information Global Design Effort

  11. Elements: RISK • Maintaining a risk register • Understanding (quantifying) value uncertainty • Formally integrating methodology into scheme (tools) Global Design Effort

  12. Cost Reduction “First step to containing / reducing cost is to keep good track of the existing ones” – anon. Global Design Effort

  13. CMG responsibilities • Define new documentation organisation for TD phase • ILC-EDMS design documentation • Part Breakdown Structure = PBS • VALUE estimate (tool?) • Cost Breakdown Structure = CBS • Consolidate RDR data • Existing data into newly defined structures • Identify missing components • Catalogue and prioritise • Begin (continue) drill-down RDR data • Design modification catalogue • Define minimum 200-500 GeV machine? • Can coordinate but TAG leaders must clearly be involved Global Design Effort

  14. Goals for this meeting • Attempt to address all questions raised on previous slides • Identify lead person(s) for identified critical items • Understand what we as a group can accomplish directly, and where we need to delegate • Generate action item lists for TAG leaders (or others) • Generate action items for us! • Make plans (i.e. identify deliverables) for • Dubna (June) • ILC08 (November) Global Design Effort

  15. CMG meeting schedule Global Design Effort

  16. CMG meeting schedule Global Design Effort

  17. Monday05May2008 09:00->12:00Monday Morning 09:00Introduction (1h00') NicholasWalker(DESY) 10:00RDR Cost Estimate website walk-through (1h00') PeterGarbincius(FNAL) 11:00Cost Management discussions (1h00') 12:00Lunch 13:30->17:00Monday Afternoon 14:00Process Cooling Water Cost Reduction Strategies (1h30') WilhelmBialowons(Deutsches Elektronen-Synchrotron DESY) 15:30Main Linac Cooling Water (1h00') MarcRoss Global Design Effort

  18. Tuesday06May2008 09:00->12:00Tuesday Morning (Convener:EwanPaterson) 09:00Positron Source Cost Estimate drill-down PeterGarbincius(FNAL) 10:30Positron Source design options (1h30') EwanPaterson(SLAC) 12:00Lunch 13:30->17:00Tuesday Afternoon (Convener:J.Carwardine) 13:30Requirements Traceability (1h00') JohnCarwardine(Argonne / ILC GDE) 14:30Cost Analysis with spreadsheets (1h00') ThomasHimel(SLAC) 15:30High Level RF cost estimate drill-down (1h00') TetsuoShidara(KEK) Global Design Effort

  19. Wednesday07May2008 09:00->12:30Wednesday Morning 09:00Mid-week summary, task assignmentN.Walker(DESY) 09:30Staging, accelerator design (1h00') EwanPaterson(SLAC) 10:30Cost considerations for one vs two tunnelsThomasHimel 11:30USTOS cost comparisons (30') ThomasHimel(SLAC) 12:00Tesla cost comparisons (30') NicholasWalker(DESY) 12:00Lunch 13:30->19:00Wednesday Afternoon 13:30Underground Space: tunnels, shafts, cavernsP.Garbincius 15:00Cost Management consulting (1h00') MarcRoss(FNAL) 16:00Magnets & Power Supplies cost estimate drill-down (1h00') JohnCarwardine(Argonne / ILC GDE) 17:00Magnets & Power Supplies cost reduction options (1h00') PaulBellomo(SLAC) ,CherrillSpencer(SLAC) Global Design Effort

  20. Thursday08May2008 09:00->11:00Thursday Morning 09:00Summary and wrap-up (15') NicholasWalker(DESY) 10:00Follow-up discussion with Lars Hagge on EDMS (1h00') Carwardine, Garbincius, Himel, Shidara Global Design Effort

  21. Output of this Meeting • Close-out summary of key issues, including: • Identify critical action items • Deliverables & dates • Decisions ! • Remaining (outstanding) issues • Written summary report • For publication (to organisation) • Basis for presentation to EC Global Design Effort