Guido Duchi. SIT AEM CR. A COMPLETE MULTI-UTILITY GEOSPATIAL MANAGED ENVIRONMENT IN CREMONA -ITALY. THE COMPANY. BUSINESS - AREAS. telecommunication. environment. energy. mobility. ELECTRIC POWER. METROPOLITAN AREA NETWORK. PARKING AREA. WATER CYCLE. DRINKABLE WATER.
E N D
Guido Duchi SIT AEM CR A COMPLETE MULTI-UTILITY GEOSPATIAL MANAGED ENVIRONMENT IN CREMONA -ITALY BE Conference 2005 – Baltimore
THE COMPANY BUSINESS - AREAS telecommunication environment energy mobility ELECTRIC POWER METROPOLITAN AREA NETWORK PARKING AREA WATER CYCLE DRINKABLE WATER MIDDLE & LOW VOLTAGE ROAD SIGNALS AEMCOM * PUBLIC LIGHTING WASTEWATER DEPURATION GAS TRAFFIC - LIGHTS SERVICES WASTE COLLECTION DISTRICT HEATING KM *: TRANSPORTS WASTE DISPOSAL RECYCLING PLATFORM INCINERATOR DUMPS * : Controlled Company BE Conference 2005 – Baltimore
THE COMPANY NETWORK DEVELOPMENT km 182 km 598 n° 44 n° 11.000 km 79 km 193 km 226 km 17 km 60 km 196 km 86 km1.200 • MIDDLE VOLTAGE • LOW VOLTAGE • TRAFFIC LIGHTS • PUBLIC LIGHTING • GAS MEDIUM PRESSURE • GAS LOW PRESSURE • POTABLE WATER DISTRIBUTION TRANSPORT • HEATING • WASTE WATER • M.A.N. • AVAILABLE INFRASTRUCTURES BE Conference 2005 – Baltimore
P&D DEPARTMENT Electric Mechanic Waste & Depuration Patrimony Cartography 1997 MAPS 2002 STUDY AEM CR ERP GIS CRM MAPS TECHNICAL SPECIFICATIONS NETWORKS DATA G.I.S. CONTROLLING MAINTENANCE DATA CUSTOM LOGISTIC WORKS MATERIAL THE COMPANY BE Conference 2005 – Baltimore
MORE QUESTIONS NETWORK PLANNING AND MANAGEMENT • Decentralization of management data archive (1 datum – n archives) • Difficult and uncertain information recovery to plan works and network development. • Expensive network management report updating. MAINTENANCE • Poor knowledge about data archives causes high costs to find information on the territory, already filed by someone. • Publishing of administrative documents, technical specifications, project files about networks or territory. SUBSOIL MANAGEMENT • To have access to right and updated information about what lays in subsoil. BE Conference 2005 – Baltimore
OUR SOLUTION • PROJECT REQUIREMENTS • Single database • Database framework able to easily manage data from different sources and different tools • Data updating according to enterprise standard procedures. • SYSTEM REQUIREMENTS • Graphic interface based on design platform • Links to relevant alphanumeric data present in the company. • Low cost publishing of technical document and maps on any company workstation BE Conference 2005 – Baltimore
THE DESIGNATED SUPPLIER SHOULD HAVE BEEN ABLE TO OFFER: • SW products that allowed high level of integration and that were easy to be customized and managed. • HW and SW low cost solutions for data publishing and viewing. • A company structure able to assure support to maintain and update the system, also after implementation • A reliable team in Italy able to solve analysis, development and installation problems BE Conference 2005 – Baltimore
PHASE 1 Software solutions to implement geospatial database for: Energy power (medium and high voltage) Water Gas Wastewater District heating Public lighting Road signals Networks Infrastructures managing network elements connectivity publishing 3D data linking key codes identifying consumers Data entering ABOUT 12 MONTHS THE PROJECT BE Conference 2005 – Baltimore
SIT AEMCR Autorities AEEG THE PROJECT ANALYSIS APPLICATION PHASE 2 • Analysis and simulation’s applications • Link to external databases • Network outage management • location of subtended consumer and network operations history. • Reports to the Energy Authority. ABOUT 6 MONTHS ISU TELECONTROL MANAGEMENT REGISTRY BE Conference 2005 – Baltimore
PHASE 3 Web publishing Manage data access from AEM Cremona users, partners or authorized consumers Within 2006 SIT AEM CR THE PROJECT KEY CUSTOMERS CRM TOP MANAGEMENT A.E.M. CR INTRANET MAINTENANCE WORKS CONTROLLING P&D DEPARTEMENT LOCAL GOVERNMENT INTERNET PARTNERS BE Conference 2005 – Baltimore
THE PROJECT ProjectWise GeoSpatial • Managing environment • Access control • Loading document archive • Update workflow BE Conference 2005 – Baltimore
THE PROJECT • MicroStation GeoGraphics + XFM technology • Data Entry Environment • Update rules • Drawing enviroment BE Conference 2005 – Baltimore
THE PROJECT Custom Applications • Manage elements connectivity • Network check/audit • Data loading into ORACLE BE Conference 2005 – Baltimore
THE PROJECT • GeoGraphics iSpatial • View & Analysis Environment BE Conference 2005 – Baltimore
PHASE 1 MILESTONES • Start up: June 2004 • Analysis review: September 2004 • MicroStation training: October 2004 • Customs Applications: January 2005 • Data entry start: January 2005 - • today implemented 20 % • Forecasted end of phase 1: • within October 2005 • Forecasted end of phase 2: within December 2005 • Phase 3: June 2006 Problems • Information recovery • Change in the drawing practice • Change of base map and coordinate system • Change in the way of thinking BE Conference 2005 – Baltimore
RESUME IN THE NEXT FUTURE • Tools to print maps • Tools for graphic reports • Geospatial database for • Geologic document • Projects • Road works monitoring BE Conference 2005 – Baltimore