1 / 17

Michael Benedikt

Future Circular Collider Study. Michael Benedikt. cern.ch/fcc. European Strategy Update 2013. “CERN should undertake design studies for accelerator projects in a global context , with emphasis on proton-proton and electron -positron high-energy frontier machines.”.

Download Presentation

Michael Benedikt

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Future Circular Collider Study Michael Benedikt cern.ch/fcc

  2. European Strategy Update 2013 “CERN should undertake design studiesfor accelerator projects in a global context, with emphasis on proton-proton and electron-positron high-energy frontier machines.”

  3. Future Circular Collider Study - SCOPE CDR and cost review for the next ESU (2018) • Forming an international collaboration to study: • pp-collider (FCC-hh)  defining infrastructure requirements • 80-100 km infrastructure in Geneva area • e+e-collider (FCC-ee) as potential intermediate step • p-e (FCC-he) option ~16 T  100 TeVpp in 100 km ~20 T  100 TeVpp in 80 km

  4. Strategic Goals Make funding bodies aware of strategic needs for research community Provide sound basis to policy bodies to establish long-range plans in European interest Strengthencapacityand effectiveness in high-tech domains Provide a basis for long-term attractiveness of Europe as research area

  5. HEP Timescale Construction Physics Upgr LEP Construction Design Proto Physics LHC Construct Design Physics HL-LHC Construction Design Proto Physics Future Collider 25 years Today CDR & Cost

  6. Time Indicator Case: LHC superconducting dipole magnets 1980 1985 1995 2000 2005 2010 1990 ~ 15 years ~ 25 years

  7. FCC-hh Key Parameters Preliminary, subject to evolution

  8. FCC-ee Key Parameters Preliminary, subject to evolution

  9. Tevatron(closed) Circumference: 6.2 km Energy: 2 TeV

  10. Large Hadron Collider Circumference: 27 km Energy: - 14 TeV (pp) - 209 GeV (e+e-)

  11. Future Circular Collider • Circumference: 80-100 km • Energy: • 100 TeV (pp) • >350 GeV (e+e-)

  12. Role of CERN Hostthe study Prepareorganisation frame Setupcollaboration IdentifyR&D needs Estimatecosts

  13. FCC Kick-off Meeting Geneva University http://indico.cern.ch/e/fcc-kickoff

  14. FCC WBS top level

  15. Study Timeline Study plan, define scope Explore Review, adjust scope Study Review, selectvariants Elaborate Review, approve material Report Release CDR

  16. Key Technologies 16 T superconducting magnets Superconducting RFcavities RF power sources Affordable & reliable cryogenics Reliability & availability concepts

  17. Future Circular Collider Study Large scale technical infrastructures Conceptual design study 2014 – 2018 Driven by international contributions Establish long-term liaisons with industry Collaborate on technology evolution (> 2025)

More Related