1. For every Civil Engineering Project, one should must hire at-least one Quantity Surveyor (QS).<br>2. A QS will access the quantities, measurements and cost of materials, together with the labor costs and services that will be required in the construction and equipment of the building.<br><br>3. From their initial calculations, a QS must have a cost discipline that enables them to estimate and monitor exactly how much a building or any other project is going to cost to build, and then advise a procurement strategy.<br><br>

Download Presentation

6 Importance of quantity surveying in construction work

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. 6 Importance of Quantity Surveying in Construction Work

  2. Role of a Quantity Surveyor in a Construction Site He/Shealso does many planning and contracting related job which is mainly involves the construction cost calculation. There are various roles of a QS in the construction industry. Below are a few related to the construction site.

  3. Estimation of Material Quantities A QS will measure the drawings and calculate the quantities of materials to procure such as Cement, Sand, Aggregates, Steel, Bricks, Blocks, Tiles, paint, etc.

  4. Procuring Contracts A Client’s QS will issue Tenders/RFQs, hold negotiation meetings, finalise contracts, issue work orders/agreements etc. Contractor’s QS will estimate quantities and do rate analysis to submit a tender.

  5. Monthly Bill Checking A Client’s QS will check the contractor’s monthly bills / contractor’s QS will prepare monthly bills based on work done on site.

  6. Material Reconciliation The QS will prepare a Reconciliation statement based on the Qty. of Materials received, Qty. of materials used, balance on site and then calculate the material wastage.

  7. Preparing Reports The QS will prepare monthly Cost reports, progress reports, Cashflow reports etc. .

  8. Contact us Location: 10 Ripplevale Cir, Carramar WA 6031, Australia Website: https://measuremanage.com.au/ Email Address: info@measuremanage.com.au Toll Free Number : 0498 202 445