1 / 10

8 BENEFITS TO USING A QUANTITY SURVEYOR

There are several reasons why you would use a quantity surveyor on a residential project. <br>1. If you are looking at the viability of a future project a quantity surveyor can look at the demographics of the scheme and do a report to highlight its feasibility. <br>2. If you get your plans drawn up, you can get a quantity surveyor to estimate the amount of materials you will be using as per the plans. <br>3. They can draw up a cost plan which highlights the cost of materials and labour required on the project for each element of the construction project. <br>4. They can analyse the specification in order to bring down the cost if required, which is known as ‘value engineering’. <br>

Download Presentation

8 BENEFITS TO USING A QUANTITY SURVEYOR

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. 8 BENEFITS TO USING A QUANTITY SURVEYOR

  2. 1 If you are looking at the viability of a future project a quantity surveyor can look at the demographics of the scheme and do a report to highlight its feasibility.

  3. 2 If you get your plans drawn up, you can get a quantity surveyor to estimate the amount of materials you will be using as per the plans.

  4. 3 They can draw up a cost plan which highlights the cost of materials and labour required on the project for each element of the construction project.

  5. 4 They can analyse the specification in order to bring down the cost if required, which is known as ‘value engineering’.

  6. 5 A quantity surveyor will help you to establish the right budget by ensuring that nothing is overlooked and the right contingency is included

  7. 6 A quantity surveyor will be well prepared to negotiate tenders and analyse any exclusions - it’s not always about the cheapest price but more to do with the value for money.

  8. 7 Each new problem will often incur additional expense often known as ‘variations’; a quantity surveyor will evaluate and negotiate variations.

  9. 8 They can help with final account settlement and sort out any snagging issues prior to final payment. For more information and competitive quantity surveying and project management quotes please do not hesitate to contact us.

  10. Contact us Location:10 Ripplevale Cir, Carramar WA 6031, AustraliaEmail : info@measuremanage.com.auWebsite :https://measuremanage.com.auPhone :0498 202 445

More Related