390 likes | 579 Views
WALI Demo. Colleen Fanelli Wednesday, October 23, 2012 FY13 Hydro Kick-off Meeting. Background. WALI 1.0 (CRR 105) is near completion and currently undergoing System Acceptance Testing.
E N D
WALI Demo Colleen Fanelli Wednesday, October 23, 2012 FY13 Hydro Kick-off Meeting
Background • WALI 1.0 (CRR 105) is near completion and currently undergoing System Acceptance Testing. • This phase allows NOAA Hydrographic Contractors to ingest water level data and generate preliminary products (W1 through W7), so that the products can be verified by CO-OPS personnel. • It also gives CO-OPS personnel remote access to facilitate teleworking capabilities but is limited in functionality when compared to the DPAS DMS system.
WALI 2.0 • WALI 2.0 (CRR 166) will incorporate all aspects of the DPAS DMS System. • Major enhancements will include: • Harmonic Analysis • Predictions • Filtering • Benchmark Sheets and Stability Analysis • L/HAT Analysis • Minor enhancements will include: • Improvements to the existing Datums capabilities • Control Panels for the Monthly (and Daily) Product Generators • Editing Environmental Data • Special Purpose Analyses • Customizable Homepage • User driven feedback for improved usability • Improvements to the Station Information Page