1 / 12

Data Communications

Data Communications. DCIT FDWG Climb Via Discussion. Agenda. New Contractions DCP’s Update DCL Examples with Climb Via Patch 7 updates. New Contractions . The following contractions are being considered for inclusion in the contractions manual in support of Data Comm Operations:

clem
Download Presentation

Data Communications

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Data Communications DCIT FDWG Climb Via Discussion

  2. Agenda • New Contractions • DCP’s Update • DCL Examples with Climb Via • Patch 7 updates

  3. New Contractions • The following contractions are being considered for inclusion in the contractions manual in support of Data Comm Operations: ALT Altitude AFT After ARPT Airport CLB Climb DP Departure

  4. Contractions Con’t DPP Departure Procedure DPFREQ Departure Frequency EDCT Expect Departure Clearance Time EXC Except EXP Expect EXP ALT Expect Altitude LCLINFO Local Information MAINT Maintain

  5. Contractions Con’t MIN Minutes NM Nautical Miles RTE Route SID Standard Instrument Departure Received confirmation that the aircraft can handle - (dash) and / (forward slash) if we wanted to make DPP into D/P or D-P  

  6. DCP’s Update for Climb Via • Still being planned for NAS deployment for the Feb 14 time frame. • AFS 470 is managing this update • Comment period is closed • Being worked with the agency • Flight Standards will update the “Info Bulletin” for flight crews and airlines • Current doc - Info Bulletin 12014 - Climb Via - 8/14/12

  7. DTAP Controller CHI • DTAP Climb Via Editor Window will have the following Climb Via instructions: • NONE, (i.e., NONE in the editor window, but the climbvia variable would be null), • CLIMB VIA SID • CLIMB VIA SID EXCEPT MAINTAIN nnn00FT • CLIMB VIA SID EXCEPT MAINTAIN nnn00FT • CLIMB VIA SID EXCEPT MAINTAIN nnn00FT • EXCEPT MAINTAIN nnn00FT • EXCEPT MAINTAIN nnn00FT • EXCEPT MAINTAIN nnn00FT

  8. Climb Via Examples Cleared As Filed CLEARED TO KSMF ARPT PORTT2.BIGGY THEN AS FILED CLIMB VIA SID EXPECT FL320 10 NM AFT DP, DPFREQ 119.200 EDCT 1212 SQUAWK 5364

  9. Climb Via - UM80 Full Route Clearance (KSMF) (KEWR) (LKV.TUDOR2) (MIKYG Q480 AIR J80 FYLLS J29 PXV) CLEARED ROUTE CLEARANCE EWR1, CLB HDG 219 THEN LEFT DCT BAGGA CLB VIA SID EXC MAINT 3000FT EXPECT FL320 10 MIN AFT DP, DPFREQ 119.200 EDCT 1212 SQUAWK 5364

  10. Climb Via - Um79 Initial Clearance • MIKYG Q480 AIR J80 FYLLS CLEARED TO PXV VIA ROUTE CLEARANCE PORTT2.BIGGY, CANARSE CLIMB AFTER PXV CLEARED TO KSMF ARPT AS FILED, CLB VIA SID EXC MAINT 10000FT EXPECT FL320 10 MIN AFT DP,DPFREQ 119.200 EDCT 1212 SQUAWK 5364

  11. Revised DCL with Climb Via MIKYG Q480 AIR J80 FYLLS REVISED RTE, D.P, CLIMBVIA CLEARED TO EWR VIA PORTT2.BIGGY CANARSE CLIMB, AFT EWR REST OF RTE UNCHNGD CLB VIA SID EXC MAINT 5000FT

  12. Backup

More Related